Portion of the work that is priced separately and thus provides and option
for owner in determining final scope. Additive or deductive work item.
Choose an answer
Procurement
1 Owner 2
(Bidding/Negotiating/Purchasing)
3 EJCDC 4 Alternate
Don't know?
Terms in this set (175)
, Owner Principle stakeholder - initiates project, assumes
risk, provides funding
AHJ - Authorities Having Protect public health, safety and welfare
Jurisdiction
Design Team Address planning issues, determine design
program, identify codes and regulations,
produce procurement and construction
documents, administer construction contract,
provide QA/QC procedures
Contractor Team Entity that constructs a facility. Uses management
abilities to gather labor forces, subs, and
material/product/equipment suppliers
Supplier Team Furnishes the materials and products for the
facility to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.
Facility Life Cycle The life cycle of a facility, from concept through
construction to use and eventual deconstruction.
Project Conception
Project Delivery
Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)
Construction
Facility Management
100% CORRECT ANSWERS
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Portion of the work that is priced separately and thus provides and option
for owner in determining final scope. Additive or deductive work item.
Choose an answer
Procurement
1 Owner 2
(Bidding/Negotiating/Purchasing)
3 EJCDC 4 Alternate
Don't know?
Terms in this set (175)
, Owner Principle stakeholder - initiates project, assumes
risk, provides funding
AHJ - Authorities Having Protect public health, safety and welfare
Jurisdiction
Design Team Address planning issues, determine design
program, identify codes and regulations,
produce procurement and construction
documents, administer construction contract,
provide QA/QC procedures
Contractor Team Entity that constructs a facility. Uses management
abilities to gather labor forces, subs, and
material/product/equipment suppliers
Supplier Team Furnishes the materials and products for the
facility to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.
Facility Life Cycle The life cycle of a facility, from concept through
construction to use and eventual deconstruction.
Project Conception
Project Delivery
Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)
Construction
Facility Management