What stage: Planning
Gather available data
Prior to occupying TTC zone
Consider the needs of all users
Coordinate between adjacent or overlapping projects
What stage: Design
Select best traffic control alternative
based on: safety, mobility, cost, constructability
1/5
, 3/25/26, 2:57 PM
What Factors effect the design of a TTC plan Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators
What are the MUTCD categories of Work Long-term
Duration? stationary
Intermediate-term
stationary short-
term stationary
short-duration
mobile
Long-term stationary (MUTCD work duration Occupies location more than 3 days
category) larger channelizing devices and post mounted signs
conflicting roadway markings removed and replaced with
temporary markings cover or remove conflicting signage
Intermediate-stationary (MUTCD work More than 1 day, less than 3
duration category) days Nightime work of more
than 1 hour
Short-term stationary (MUTCD work duration Daytime work 1 to 12
category) hours cones and
portable signs
Nature of the Constructability
work access
requirements
drainage issues, drainage during
construction construction equipment
size of work
space Access to
work area
2/5