LGAV 3110 FINAL EXAM ACTUAL 2026
QUESTIONS AND 100% CORRECT ANSWERS
Save
Terms in this set (98)
The _________ department evaluates Engineering
maintenance requirements and
establishes the maintenance
program for the airline.
Mechanics
Maintenance
Engineering
PP&C
An EO can be initiated due to All of the above
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above
________study the practical aspects of Mechanics, Engineers
aviation systems and equipment
while ________are trained in the basics
of science and are 'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers
,One of the primary functions of New equipment evaluation
Engineering is
Aircraft repair
New equipment evaluation
Forecasting future problems
Resource management
Engineering is considered a False
substitute for maintenance when
mechanics are unable to solve a
problem.
True
False
PP&C controls maintenance by Adjusting the plan and keeping checks on
schedule
Adjusting the plan and keeping
checks on schedule
Creating long and short-term
maintenance models for mechanics
to follow
Planning routing, variable routine,
and non-routine tasks
Writing technical publications for
future planning
, Planning and scheduling the Planning
appropriate manpower, parts and
facilities are examples of PP&C's
_____ function.
Forecasting
Production
Planning
Controlling
PP&C is primarily responsible for Planning and scheduling all aircraft maintenance
activity within an airline
Scheduling daily, 48-hour, and
transit checks
Ordering parts and estimating the
amount of labor needed for
unscheduled maintenance
Planning and scheduling all aircraft
maintenance activity within an
airline
Providing feedback on completed
maintenance jobs
Schedules for checks and known Short-Term
modifications are finalized in which
type of forecast?
Long-term
Intermediate term
Short-Term
Extended-term
This PP&C function is considered an Planning
'idealized' responsibility
Forecasting
Production
Planning
Controlling
QUESTIONS AND 100% CORRECT ANSWERS
Save
Terms in this set (98)
The _________ department evaluates Engineering
maintenance requirements and
establishes the maintenance
program for the airline.
Mechanics
Maintenance
Engineering
PP&C
An EO can be initiated due to All of the above
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above
________study the practical aspects of Mechanics, Engineers
aviation systems and equipment
while ________are trained in the basics
of science and are 'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers
,One of the primary functions of New equipment evaluation
Engineering is
Aircraft repair
New equipment evaluation
Forecasting future problems
Resource management
Engineering is considered a False
substitute for maintenance when
mechanics are unable to solve a
problem.
True
False
PP&C controls maintenance by Adjusting the plan and keeping checks on
schedule
Adjusting the plan and keeping
checks on schedule
Creating long and short-term
maintenance models for mechanics
to follow
Planning routing, variable routine,
and non-routine tasks
Writing technical publications for
future planning
, Planning and scheduling the Planning
appropriate manpower, parts and
facilities are examples of PP&C's
_____ function.
Forecasting
Production
Planning
Controlling
PP&C is primarily responsible for Planning and scheduling all aircraft maintenance
activity within an airline
Scheduling daily, 48-hour, and
transit checks
Ordering parts and estimating the
amount of labor needed for
unscheduled maintenance
Planning and scheduling all aircraft
maintenance activity within an
airline
Providing feedback on completed
maintenance jobs
Schedules for checks and known Short-Term
modifications are finalized in which
type of forecast?
Long-term
Intermediate term
Short-Term
Extended-term
This PP&C function is considered an Planning
'idealized' responsibility
Forecasting
Production
Planning
Controlling