If it is necessary to wash vehicle tires to remove excess
sediment, the sediment run-off must be:
A) Kept at the construction exit pad
B) Filtered with hay bales
C) Directed away from the road with a diversion
D) Directed into an approved sediment trap or sediment
basin - Answer-C) Directed away from the road with a
diversion
The maintenance requirements for all BMPs are only
found in the Field Manual for Erosion and Sediment
Control in Georgia.
A) True
B) False - Answer-A) True
All land-disturbing activities covered by the E & SC Act
must first secure a Land Disturbing Activity (LDA) Permit.
Who is responsible for obtaining this permit?
,2|Page
A) Design Engineer
B) Building Contractor
C) Owner/ Operator
D) Utility Subcontractor - Answer-C) Owner/ Operator
If the local issuing authority's enforcement officer observed
a significant amount of sediment entering state waters
from a land disturbing activity the officer should do which
of the following?
A) Issue a strongly worded Notice of Violation
B) Start proceedings for Forfeiture of Bonding
C) Move to revoke the company's business license
D) Issue a Stop Work Order - Answer-D) Issue a Stop
Work Order
Spillway pipe for a temporary sediment basin cannot be
constructed with a pipe smaller than _____ inches.
A) 6
B) 8
C) 10
D) 12 - Answer-B) 8
,3|Page
What is the amount of over fall allowed at the end of the
storm drain outlet apron?
A) 1/2 the diameter of the rip rap used
B) Not to exceed 6 inches
C) 1/2 the thickness of the apron
D) Zero - Answer-D) Zero
A slope gradient of 25% (4:1) would indicate that in a
horizontal length of 100 feet, the vertical rise would be
______ feet.
A) 2.5
B) 12.5
C) 25
D) 4 - Answer-C) 25
As rain falls to the earth, what is the very first function of
vegetation?
A) It reduces detachment
B) It increases infiltration
C) It absorbs rain drop impact
, 4|Page
D) Roots hold soil in place - Answer-A) It reduces
detachment
Because of the likelihood of thunderstorms which is the
worst month to schedule land disturbing activities?
A) April
B) July
C) September
D) October - Answer-B) July
Which of the following is not a stage in Erosion and
Sedimentation?
A) Detachment
B) Solubility
C) Transport
D) Deposition - Answer-B) Solubility
At what depth must sediment be removed from a silt fence
barrier?
A) 12 Inches
B) 16 Inches