Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

WGU C722 Project Management Exam Questions With 100- Complete Solutions

Beoordeling
-
Verkocht
-
Pagina's
95
Cijfer
A+
Geüpload op
12-05-2026
Geschreven in
2025/2026

WGU C722 Project Management Exam Questions With 100- Complete Solutions

Instelling
WGU C722
Vak
WGU C722

Voorbeeld van de inhoud

WGU C722 Project Management Exam
Questions With 100% Complete Solutions


A firm begins its strategic business initiative of developing a new business model
| | | | | | | | | | | | |


that will allow the firm to deliver an efficient, tailored service to its customers. To
| | | | | | | | | | | | | | |


accomplish this, the firm initiates a business management project. Which aspect
| | | | | | | | | | |


of project management applies to this firm's project? - CORRECT ANSWER✔✔-
| | | | | | | | | |


Interdependent Tasks |




A firm begins its strategic business initiative of developing a new business model
| | | | | | | | | | | | |


to enhance its competitiveness. What can be identified as a strategic business
| | | | | | | | | | | |


initiative for this firm? - CORRECT ANSWER✔✔-Improvement in product design
| | | | | | | | |




A firm begins a strategic business initiative of developing a new business model
| | | | | | | | | | | | |


that will allow the firm to deliver an efficient, tailored service to its customers. -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Project sponsor | |




Which group is included in the five process groups? - CORRECT ANSWER✔✔-
| | | | | | | | | | |


Closing process group| |




What does PRINCE2 stand for? - CORRECT ANSWER✔✔-PRojects IN a Controlled
| | | | | | | | | | |


Environment


Which PMBOK process group is described as the delivery part of project
| | | | | | | | | | | |


management where the main activity happens? - CORRECT ANSWER✔✔-
| | | | | | | |


Executing

,Which advantage does the functional (departmentalized) organizational structure
| | | | | | | |


provide for a firm with multiple projects? - CORRECT ANSWER✔✔-Lines of
| | | | | | | | | | |


authority are clear. | |




Which two organizations are examples of organizations with the functional
| | | | | | | | | |


organizational structure? - CORRECT ANSWER✔✔-(1) The U.S. Department of
| | | | | | | | |


State and (2) The U.S Department of Energy
| | | | | | |




An organization expects to use a project management office (PMO) to support
| | | | | | | | | | | |


multiple projects that will be implemented within a projectized organizational
| | | | | | | | | |


structure. Which implied effect is a benefit to this organization? - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-Project team members gain access to historical data from other | | | | | | | | | |


projects.


Regardless of the organizational structure used to manage a project, an
| | | | | | | | | | |


organization elects to use a project management office (PMO). Which benefit will
| | | | | | | | | | | |


this organization gain? - CORRECT ANSWER✔✔-Projects will coordinate resource
| | | | | | | | |


usage by monitoring the status of shared resources.
| | | | | | |




During a certain project phase, specific blueprints are drawn and approved,
| | | | | | | | | | |


materials and labor costs are estimated, prototypes are created, and work
| | | | | | | | | | |


activities and tasks are identified. Also, quality expectations, measurements, and
| | | | | | | | | |


costs are defined. During which project phase do these activities occur? -
| | | | | | | | | | | |


CORRECT ANSWER✔✔-Planning |




Place the project activities in order of occurrence from first (1) to last (5). -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-(1) Collecting customer requirements (2) Developing the
| | | | | | | |

,work breakdown structure (3) Working to produce project deliverables (4)
| | | | | | | | | |


Customers evaluating the project outcomes (5) Capturing lessons learned
| | | | | | | |




During which life cycle phase is the vast majority of the actual work to produce
| | | | | | | | | | | | | | |


the project's deliverables completed? - CORRECT ANSWER✔✔-Executing
| | | | | |




What is the correct term for an intermediate outcome of project work, such as a
| | | | | | | | | | | | | | |


signed contract or obtaining a construction permit? - CORRECT ANSWER✔✔-
| | | | | | | | |


Deliverable


Which deliverable from a work breakdown structure (WBS) is not specific enough
| | | | | | | | | | | |


to measure its completion at project closure? - CORRECT ANSWER✔✔-User
| | | | | | | | | |


training


The following table shows the Level 1 work breakdown structure (WBS) for
| | | | | | | | | | | |


Project A. | |


|



| WBS ID Description
| | |




| 0.0 Project A
| |




| 1.0 Project started
| |




| 2.0 Feasiblity
|




| 3.0 Design
|




| 4.0 Development
|




| 5.0 Manufacturing
|




| 6.0 Distribution
|




| 7.0 Project completed
| | |

, Which approach did the project manager use to structure the WBS? - CORRECT
| | | | | | | | | | | | |


ANSWER✔✔-Sequence of project phases | | |




For the following collapsed work breakdown structure (WBS) for Project O, the
| | | | | | | | | | | |


project manager must complete the scope baseline. In addition to the WBS, the
| | | | | | | | | | | | |


scope baseline will contain two additional documents.
| | | | | | |


|



WBS ID Description
| |




0.0 Project O
| |




1.0 Project started
| |




2.0 Feasibility
|




3.0 Design
|




4.0 Development
|




5.0 Manufacturing
|




6.0 Distribution
|




7.0 Project completed
| |




What are the other two documents that belong in the scope baseline? - CORRECT
| | | | | | | | | | | | |


ANSWER✔✔-WBS dictionary and project scope statement
| | | | | |




For the following collapsed work breakdown structure (WBS) for Project O, the
| | | | | | | | | | | |


project's steering committee held a phase gate review of the Feasibility results.
| | | | | | | | | | | |


That review determined that the project's proposed design would be obsolete
| | | | | | | | | | |


before it would reach the marketplace.
| | | | | |


|



WBS ID Description
| |




0.0 Project O
| |

Geschreven voor

Instelling
WGU C722
Vak
WGU C722

Documentinformatie

Geüpload op
12 mei 2026
Aantal pagina's
95
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$23.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Lectphilip West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
239
Lid sinds
1 jaar
Aantal volgers
6
Documenten
23073
Laatst verkocht
5 uur geleden
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

4.0

41 beoordelingen

5
20
4
8
3
9
2
2
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen