CERTIFICATION 2026 TEST PAPER
QUESTIONS ANSWERS GRADED A+
◉ True or False: To upload a revision to your spec book, you will first
need to delete the old version from Procore..
Answer: False
◉ Why are some action buttons inactive and gray?.
Answer: Because certain actions require that you first select one or more
spec sections before the button becomes orange/clickable
◉ In Procore, what does it mean if there is a blue caret in a field?.
Answer: The field is editable in-line
◉ True or False: If you have a project with more than one building or
area, you should enable the "Drawings by Area" feature..
Answer: True
◉ True or False: When you click a project's Drawings tool, you should
expect to see the project's "current set" of drawings. (i.e. The most
recently uploaded revisions of each drawing.).
Answer: True
◉ If you see this icon next to a drawing, what does it mean?
, square & triangle.
Answer: The drawing contains manually added markups
◉ If you see this icon next to a drawing, what does it mean?
SK.
Answer: The drawing has sketches associated with it
◉ Who can view drawing markups on your 'Personal' layer?.
Answer: Only you
◉ True or False: You can now have your Design Team upload drawings
directly to the Drawings tool without having the drawings be published
immediately..
Answer: True
◉ True or False: You can add correspondence types by selecting from a
template or creating your own..
Answer: True
◉ Which permission level on the Photos tool does Procore recommend
you give to architects and engineers who are collaborators on the project
if you want them to upload photos, but not have access to the
configuration settings?.
Answer: Standard