Terms in this set (146)
According to the IBC, the "blank" is to hire the special owner or owners agent. 2009 IBC Section 1704.1
inspector.
According to the IBC, the "blank" is the responsible for code official. 2009 IBC, Section 1704.1
the approval of a person's qualifications to act as a
special inspector.
According to the IBC, discrepancy corrections are final report. 2009 IBC, Section1704.1.2
made known to the building official by:
When is the code official to be made aware of a If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2
discrepancy found during a special inspection?
According to the Model Program for Special In a written report - Section II B 4 - Model Programs
Inspection, the special inspector is to document work
that is nonconforming:
According to the Model Program for Special After each inspection visit - Section II B 5 - Model Programs
Inspection, the special inspector is to prepare written
report of inspection:
According to the Model Program for Special Description of discussions with the contractor - Section B 5 - Model Programs
Inspection, which of the following items does not need
to be included in each inspection report?
, According to the Specification for Structural Joints 1/16 inch - Specification for Structural Joints Table 3.1
using high strength bolts, the nominal diameter of
standard bolt holes shall be how much larger than the
nominal bolt diameter?
Discrepancies in the work shall be brought to the the contractor - 2009 IBC, Section 1704.1.2.
immediate attention of the "blank" for corrective action.
The special inspector shall furnish inspection reports to Building Official and Registered Design professional
the "blank" and to the "blank"?
The special inspector shall provide continuos Single-pass fillet welds greater than 5/16 inch in size - 2099 IBC, Table 1704.3,
inspection of: Item 5.3
The special inspections required by this code are not Approved fabricator - 2009 IBC, Section 1704.2.2
required where the work is done on the premise of a?
The special inspection of the steel fabrication process heating operations - 2009 IBC, Section 1704.3, Exceptions # 1
shall not be required where the fabricator does not
perform any?
According to the Specifications for Structural Steel A568 - Section A31, Specifications for Structural Steel Buildings
Buildings, ASTM Standard "blank" is to be used for the
material test for steel sheets.
According to the Specifications for Structural Steel Fabricator or Testing Laboratory - Section A31, Specifications for Structural
Buildings, the "blank" conducts the material tests for Steel Buildings.
identification of the structural steel.
According to the Specifications for Structural Steel Unimportant members, where their physical properties and weldability would
Buildings, which of the following steel members are not affect the structure strength - Section A31b, Specifications for Structural
allowed to be unidentified steel? Steel Buildings
According to the Code of Standard Practice for Steel It is marked by the supplier - Section 5.1.1, Code of Standard Practice for Steel
Buildings and Bridges, how is steel of special material Buildings and Bridges
to be identified?
According to the Code of Standard Practice for Steel Certified mill test reports - Section 5.2.2 - Code of Standard Practice for Steel
Buildings and Bridges, how are fabricators stock steel Buildings and Bridges
material identified?
According to the Specification for Structural Steel A53 - Section A31a - Specification for Structural Steel Buildings
Buildings, what ASTM Standard would apply to a
sample for structural steel pipe?
According to the Code of Standard Practice for Steel The number specified by the ASTM specification - Section 5.1.1 - Code of
Buildings and Bridges, the number of samples required Standard Practice for Steel Buildings and Bridges
to be tested for structural steel is:
With 100% Correct Answers graded A+ Guaranteed
Success!!
Leave the first rating
Save
Students also studied
Flashcard sets Study guides
Asphalt Paving Level 2 Comprehensive Building Systems: W... Crane Operator Test BIC
Teacher 50 terms Teacher 26 terms Teacher 300 terms Te
victor_kimotho Preview milansh860 Preview stanleyfadhlan32 Preview
Terms in this set (146)
According to the IBC, the "blank" is to hire the special owner or owners agent. 2009 IBC Section 1704.1
inspector.
According to the IBC, the "blank" is the responsible for code official. 2009 IBC, Section 1704.1
the approval of a person's qualifications to act as a
special inspector.
According to the IBC, discrepancy corrections are final report. 2009 IBC, Section1704.1.2
made known to the building official by:
When is the code official to be made aware of a If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2
discrepancy found during a special inspection?
According to the Model Program for Special In a written report - Section II B 4 - Model Programs
Inspection, the special inspector is to document work
that is nonconforming:
According to the Model Program for Special After each inspection visit - Section II B 5 - Model Programs
Inspection, the special inspector is to prepare written
report of inspection:
According to the Model Program for Special Description of discussions with the contractor - Section B 5 - Model Programs
Inspection, which of the following items does not need
to be included in each inspection report?
, According to the Specification for Structural Joints 1/16 inch - Specification for Structural Joints Table 3.1
using high strength bolts, the nominal diameter of
standard bolt holes shall be how much larger than the
nominal bolt diameter?
Discrepancies in the work shall be brought to the the contractor - 2009 IBC, Section 1704.1.2.
immediate attention of the "blank" for corrective action.
The special inspector shall furnish inspection reports to Building Official and Registered Design professional
the "blank" and to the "blank"?
The special inspector shall provide continuos Single-pass fillet welds greater than 5/16 inch in size - 2099 IBC, Table 1704.3,
inspection of: Item 5.3
The special inspections required by this code are not Approved fabricator - 2009 IBC, Section 1704.2.2
required where the work is done on the premise of a?
The special inspection of the steel fabrication process heating operations - 2009 IBC, Section 1704.3, Exceptions # 1
shall not be required where the fabricator does not
perform any?
According to the Specifications for Structural Steel A568 - Section A31, Specifications for Structural Steel Buildings
Buildings, ASTM Standard "blank" is to be used for the
material test for steel sheets.
According to the Specifications for Structural Steel Fabricator or Testing Laboratory - Section A31, Specifications for Structural
Buildings, the "blank" conducts the material tests for Steel Buildings.
identification of the structural steel.
According to the Specifications for Structural Steel Unimportant members, where their physical properties and weldability would
Buildings, which of the following steel members are not affect the structure strength - Section A31b, Specifications for Structural
allowed to be unidentified steel? Steel Buildings
According to the Code of Standard Practice for Steel It is marked by the supplier - Section 5.1.1, Code of Standard Practice for Steel
Buildings and Bridges, how is steel of special material Buildings and Bridges
to be identified?
According to the Code of Standard Practice for Steel Certified mill test reports - Section 5.2.2 - Code of Standard Practice for Steel
Buildings and Bridges, how are fabricators stock steel Buildings and Bridges
material identified?
According to the Specification for Structural Steel A53 - Section A31a - Specification for Structural Steel Buildings
Buildings, what ASTM Standard would apply to a
sample for structural steel pipe?
According to the Code of Standard Practice for Steel The number specified by the ASTM specification - Section 5.1.1 - Code of
Buildings and Bridges, the number of samples required Standard Practice for Steel Buildings and Bridges
to be tested for structural steel is: