(2026/2027) | Comprehensive Review | A+
Verified
• a. A California licensed professional engineer with hydrological expertise.
c. A California licensed professional geologist with hydrological expertise.
d. a or c (Correct Answer) -✓✓Who must sign the No Discharge Technical Report?
• a. A description of the corresponding location and orientation of the photos as
indicated in the site map.
b. Photos of the site's final site conditions and post-construction BMPs.
c. a and b. (Correct Answer) -✓✓Which of the following must be included in the Notice
of Termination photo documentation?
• 30 days -✓✓A Notice of Termination is automatically approved if no action is taken by
the RWQCB after what amount of time?
• a. They are subject to the post-construction standards of an active phase I MS4
permit.
b. They are subject to the post-construction standards of an active phase II MS4 permit.
c. They are linear underground and overhead projects.
d. Any of the above. (Correct Answer) -✓✓Under what conditions are projects exempt
from the post-construction requirements in Order, Section IV.N.3?
• a. Non-structural measures.
b. Structural measures.
c. a and b.
d. Neither a nor b. (Correct Answer) -✓✓Which of the following post-construction
stormwater control measures require Regional Water Board staff review and approval?
• Relocating fiberoptic cable underground while repairing noncontiguous sections of
road within the city limits. -✓✓Which of the following projects might apply for
Programmatic Permitting Regulatory Coverage?
• a. A SWPPP covering activities common to all the projects.
b. A linear construction activity notification describing site-specific project name,
location, contact, and site acreage.
c. A site-specific map detailing pollutant sources, BMPs implemented, start and end
dates, and risk type.
d. All of the above. (Correct Answer) -✓✓What does a LUP discharger with
programmatic permitting coverage submit prior to construction activity?
• a. The residential lot is one or more acres.