NCEES PE CIVIL STRUCTURAL EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS NEWEST VERSION 1. Which of the following statement regarding lateral earth pressures is correct? A. the lateral strain required to fully mobilize the soil passive pressure is considerably smaller than the lateral strain required to fully mobilize the soil active pressure. B. the lateral strain required to fully mobilize the soil passive pressure is slightly smaller than the lateral strain required to fully mobilize the soil active pressure. C. the lateral strain required to fully mobilize the soil passive pressure is slightly larger than the lateral strain required to fully mobilize the soil active pressure. D. the lateral strain required to fully mobilize the soil passive pressure is considerably larger than the lateral strain required to fully mobilize the soil active pressure. - ANSWER D is correct. - from general physics knowledge the force it takes to move anything from a complete standstill will be greater than the force it takes to move something already in motion, this immediately eliminates A and B. - looking at the graph you can see that the lateral earth pressure for passive pressure is at least twice that of active pressure, this eliminates option C. 2. A bridge footing is to be constructed in sand. The groundwater level is at the ground surface. The ultimate bearing capacity is based on what type of soil unit weight? A. Buoyant unit weight B. Saturated unit weight C. Dry unit weight D. Total unit weight - ANSWER A is correct. - buoyant unit weight is also known as the effective unit weight - effective unit weight = saturated unit weight - unit weight of water 3. according to IBC 2018 and applicable quality assurance inspection requirements, which of the following inspection tasks are required for ASTM A325N high-strength bolts used in a steel framed structure? (select the two that apply) A. verification of the magnitude of the clamping force B. calibration of the torque wrench C. confirmation that the proper fastener components are used D. confirmation that the faying surfaces are brought into firm contact during installation of the bolts E. confirmation that the bolt installed has an AWS D1.1 certification - ANSWER C and D are correct. - IBC 2018, section 1705.2.1 (structural steel) states 'special inspections and nondestructive testing of structural steel elements in buildings, structures, and portions thereof shall be in accordance with the quality assurance inspection requirements of AISC 360' - AISC 360 Chapter N states ' snug-tightened joints are required to be inspected to ensure that the proper fastener components are used and that the faying surfaces are brought into firm contact during installation of the bolts. 4. According to IBC 2018, which of the following represents the minimum factor of safety against uplift of deep pile elements due to wind or seismic loading? (Select the two that apply) A. one and one-half when capacity is determined by approved load tests B. two when capacity is determined by approved load tests C. two when capacity is determined by an approved method of analysis D. three when capacity is determined by an approved method of analysis E. four when capacity is determined by an approved method of analysis - ANSWER A and C are correct. - IBC 2018 section 1810.3.3.1.5 lists 1) minimum factor of safety of two where capacity is determined by an analysis 2) and one and one-half where capacity is determined by load tests 5. According to IBC 2018, which of the following represent the minimum compressive strength of a precast concrete pile before driving? (select the two that apply) A. 75% of the specified compressive strength B. 80% of the specified compressive strength C. not less than the strength sufficient to withstand handling and driving forces D. one and one-half times the sufficient strength to withstand initial prestress load upon transfer E. must be determined by load testing - ANSWER A and C are correct. - IBC 2018 section 1810.4.1.1 states that a precast concrete pile shall not be driven before the concrete has attained compressive strength not less than 75% of the specified compressive strength, also not less than the strength sufficient to withstand handling and driving forces. 6. Flexible vs Rigid Diaphragm - ANSWER 12.3.1.1 of ASCE 7. Two Way Shear/Punching Shear - ANSWER 22.6.1 General 22.6.5 Equations ACI 318-14 8. Analogous Estimate - ANSWER Use of historical data to define cost of a typical facility 9. Parametric Estimate - ANSWER Unit cost data from bids of prior projects, adjusted for current prices 10. Cost Based Estimate - ANSWER Based on contractors cost for projects (getting bids) 11. Direct (Variable) Costs - ANSWER Material costs, salary & labor costs, equipment ownership/rental costs 12. Indirect (Fixed) Cost - ANSWER Bond Premiums, insurance premiums, fees for permits & licenses and office expenses 13. Board Foot - ANSWER Measure of volume (1'X1'X1"=144in^3) 14. Total Float - ANSWER The amount of time that a schedule activity can be delayed without delaying the project end date 15. Free Float - ANSWER Amount of time an activity can be delayed without delaying the early start date of the next activity 16. Budgeted Cost Work Schedule (BCWS) - ANSWER Planned Value, What is planned in terms of budgeted cost of work 17. Budgeted Cost of Work Preformed (BCWP) - ANSWER Earned Value, What is done in terms of budgeted cost of work 18. Actual Cost of Work Preformed (ACWP) - ANSWER What is paid, Actual cost of work that has been accomplished to date 19. Cost Variance - ANSWER Difference between BCWP & ACWP, Greater than 0 = under budget 20. Schedule Variance - ANSWER Difference between BCWP & BCWS, Greater than 0 = ahead of schedule 21. Dead Load, D - ANSWER Weight of permanent construction in place (includes non-structural loads - cladding, partitions, railings and ceilings) 22. Live Loads, L - ANSWER Produced by use or occupancy of a structure (for bridges and other structures it includes impact as well as longitudinal & centrifugal forces from vehicles) 23. Construction Dead Load, CD - ANSWER Dead load of temporary structure in place 24. Stockpiled Formwork (Loading) - ANSWER Changes from variable to fixed when installed in its place 25. Fresh Concrete (Loading) - ANSWER Variable when poured, fixed when hardened

Meer zien Lees minder
Instelling
NCEES PE CIVIL STRUCTURAL
Vak
NCEES PE CIVIL STRUCTURAL

Voorbeeld van de inhoud

NCEES PE CIVIL STRUCTURAL EXAM
STUDY GUIDE 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED
ANSWERS || 100% GUARANTEED PASS
<NEWEST VERSION>


1. Which of the following statement regarding lateral earth pressures is
correct?
A. the lateral strain required to fully mobilize the soil passive pressure is
considerably smaller than the lateral strain required to fully mobilize
the soil active pressure.
B. the lateral strain required to fully mobilize the soil passive pressure is
slightly smaller than the lateral strain required to fully mobilize the
soil active pressure.
C. the lateral strain required to fully mobilize the soil passive pressure is
slightly larger than the lateral strain required to fully mobilize the soil
active pressure.
D. the lateral strain required to fully mobilize the soil passive pressure is
considerably larger than the lateral strain required to fully mobilize
the soil active pressure. - ANSWER ✔ D is correct.
- from general physics knowledge the force it takes to move
anything from a complete standstill will be greater than the
force it takes to move something already in motion, this
immediately eliminates A and B.
- looking at the graph you can see that the lateral earth pressure
for passive pressure is at least twice that of active pressure,
this eliminates option C.

2. A bridge footing is to be constructed in sand. The groundwater level is at the
ground surface. The ultimate bearing capacity is based on what type of soil
unit weight?
A. Buoyant unit weight
B. Saturated unit weight
C. Dry unit weight

, D. Total unit weight - ANSWER ✔ A is correct.
- buoyant unit weight is also known as the effective unit weight
- effective unit weight = saturated unit weight - unit weight of
water

3. according to IBC 2018 and applicable quality assurance inspection
requirements, which of the following inspection tasks are required for
ASTM A325N high-strength bolts used in a steel framed structure? (select
the two that apply)
A. verification of the magnitude of the clamping force
B. calibration of the torque wrench
C. confirmation that the proper fastener components are used
D. confirmation that the faying surfaces are brought into firm contact
during installation of the bolts
E. confirmation that the bolt installed has an AWS D1.1 certification -
ANSWER ✔ C and D are correct.
- IBC 2018, section 1705.2.1 (structural steel) states 'special
inspections and nondestructive testing of structural steel
elements in buildings, structures, and portions thereof shall be
in accordance with the quality assurance inspection
requirements of AISC 360'
- AISC 360 Chapter N states ' snug-tightened joints are required
to be inspected to ensure that the proper fastener components
are used and that the faying surfaces are brought into firm
contact during installation of the bolts.

4. According to IBC 2018, which of the following represents the minimum
factor of safety against uplift of deep pile elements due to wind or seismic
loading? (Select the two that apply)
A. one and one-half when capacity is determined by approved load tests
B. two when capacity is determined by approved load tests
C. two when capacity is determined by an approved method of analysis
D. three when capacity is determined by an approved method of analysis
E. four when capacity is determined by an approved method of analysis -
ANSWER ✔ A and C are correct.
- IBC 2018 section 1810.3.3.1.5 lists 1) minimum factor of
safety of two where capacity is determined by an analysis
2) and one and one-half where capacity is determined by load tests

,5. According to IBC 2018, which of the following represent the minimum
compressive strength of a precast concrete pile before driving? (select the
two that apply)
A. 75% of the specified compressive strength
B. 80% of the specified compressive strength
C. not less than the strength sufficient to withstand handling and driving
forces
D. one and one-half times the sufficient strength to withstand initial
prestress load upon transfer
E. must be determined by load testing - ANSWER ✔ A and C are
correct.
- IBC 2018 section 1810.4.1.1 states that a precast concrete pile
shall not be driven before the concrete has attained
compressive strength not less than 75% of the specified
compressive strength, also not less than the strength sufficient
to withstand handling and driving forces.

6. Flexible vs Rigid Diaphragm - ANSWER ✔ 12.3.1.1 of ASCE

7. Two Way Shear/Punching Shear - ANSWER ✔ 22.6.1 General
22.6.5 Equations
ACI 318-14

8. Analogous Estimate - ANSWER ✔ Use of historical data to define cost of
a typical facility

9. Parametric Estimate - ANSWER ✔ Unit cost data from bids of prior
projects, adjusted for current prices

10.Cost Based Estimate - ANSWER ✔ Based on contractors cost for projects
(getting bids)

11.Direct (Variable) Costs - ANSWER ✔ Material costs, salary & labor costs,
equipment ownership/rental costs

12.Indirect (Fixed) Cost - ANSWER ✔ Bond Premiums, insurance premiums,
fees for permits & licenses and office expenses

, 13.Board Foot - ANSWER ✔ Measure of volume (1'X1'X1"=144in^3)

14.Total Float - ANSWER ✔ The amount of time that a schedule activity can
be delayed without delaying the project end date

15.Free Float - ANSWER ✔ Amount of time an activity can be delayed
without delaying the early start date of the next activity

16.Budgeted Cost Work Schedule (BCWS) - ANSWER ✔ Planned Value,
What is planned in terms of budgeted cost of work

17.Budgeted Cost of Work Preformed (BCWP) - ANSWER ✔ Earned Value,
What is done in terms of budgeted cost of work

18.Actual Cost of Work Preformed (ACWP) - ANSWER ✔ What is paid,
Actual cost of work that has been accomplished to date

19.Cost Variance - ANSWER ✔ Difference between BCWP & ACWP,
Greater than 0 = under budget

20.Schedule Variance - ANSWER ✔ Difference between BCWP & BCWS,
Greater than 0 = ahead of schedule

21.Dead Load, D - ANSWER ✔ Weight of permanent construction in place
(includes non-structural loads - cladding, partitions, railings and ceilings)

22.Live Loads, L - ANSWER ✔ Produced by use or occupancy of a structure
(for bridges and other structures it includes impact as well as longitudinal &
centrifugal forces from vehicles)

23.Construction Dead Load, CD - ANSWER ✔ Dead load of temporary
structure in place

24.Stockpiled Formwork (Loading) - ANSWER ✔ Changes from variable to
fixed when installed in its place

25.Fresh Concrete (Loading) - ANSWER ✔ Variable when poured, fixed
when hardened

Geschreven voor

Instelling
NCEES PE CIVIL STRUCTURAL
Vak
NCEES PE CIVIL STRUCTURAL

Documentinformatie

Geüpload op
13 mei 2026
Aantal pagina's
86
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ProfBenjamin Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
642
Lid sinds
1 jaar
Aantal volgers
17
Documenten
3855
Laatst verkocht
14 uur geleden
EXCELLENT ACHIEVERS LIBRARY

As a professional tutor, I provide exceptional assistance with homework, quizzes, and exams across various subjects, including Psychology, Nursing, Biological Sciences, Business, Engineering, Human Resource Management, and Mathematics. I am dedicated to offering high-quality support and ensuring that all work meets scholarly standards. To enhance the effectiveness of our services, I work with a team of experienced tutors to create comprehensive and effective revision materials. Together, we are committed to helping students achieve excellent grades through our collaborative efforts and expertise.

Lees meer Lees minder
3.8

135 beoordelingen

5
63
4
18
3
33
2
9
1
12

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen