Framework: OA Scenario Analysis, PA
Submission Strategy, Competency
Prioritization & High-Impact Study Method
(2026–2027)
Description
The WGU Fast-Track Framework is a comprehensive and
strategically designed study resource created for students
at Western Governors University (WGU) who want to
progress through their courses with speed, clarity, and
confidence. Built around WGU’s competency-based
education model, this guide focuses on helping you
identify exactly what is required to pass and how to
approach assessments in the most efficient way possible.
Unlike traditional study materials that often lead to
overstudying and confusion, this framework is designed
to help you prioritize, apply, and execute. It provides a
clear system that allows you to focus on high-impact
areas, understand assessment expectations, and perform
,effectively in both Objective Assessments (OA) and
Performance Assessments (PA).
1. Estimating in roofing is the process of:
A. Painting
B. Calculating project cost
C. Designing
D. Cleaning
2. A roofing estimate includes:
A. Color only
B. Materials and labor
C. Height only
D. Shape
3. A takeoff is:
A. Removing roof
B. Measuring materials needed
C. Painting
D. Cleaning
4. Roofing materials are measured in:
A. Liters
B. Squares
C. Kg
D. Meters
5. One roofing square equals:
A. 10 sq ft
B. 100 sq ft
C. 50 sq ft
D. 200 sq ft
6. Labor cost depends on:
A. Color
B. Complexity and time
, C. Paint
D. Size only
7. Overhead includes:
A. Direct materials
B. Business expenses
C. Labor only
D. Profit
8. Profit is:
A. Cost
B. Earnings after expenses
C. Labor
D. Waste
9. Waste factor accounts for:
A. Extra materials
B. Labor
C. Paint
D. Height
10. Estimating accuracy affects:
A. Profitability
B. Color
C. Shape
D. Height
Cost Components
11. Direct costs include:
A. Materials and labor
B. Profit
C. Overhead
D. Taxes
12. Indirect costs are:
A. Materials
B. Overhead expenses