Practice Exam 2026 200 Questions with
Answers & Rationales
Section 1: Site Safety Log & Documentation (Questions 1–15)
1. The site safety log shall be kept __________.
A) At the main office
B) At the site
C) At the contractor's headquarters
D) With the FDNY
Answer: B
Rationale: The site safety log must be kept on-site at all times for inspection by the
Department of Buildings (DOB).
2. If an alternate SSM comes to relieve the primary SSM, this shall be noted in the
__________.
A) Daily report to owner
B) Site safety log
C) Incident report
D) Scaffold inspection log
Answer: B
Rationale: Any change of personnel, including relief, must be documented in the site
safety log to ensure accountability.
3. The site safety log must be available for inspection by the DOB for how long after
project completion?
A) 30 days
B) 6 months
C) 1 year
D) 3 years
Answer: D
Rationale: Standard record retention for DOB site safety logs is three years after final
permit sign-off.
4. Which of the following must be recorded in the site safety log?
A) Daily weather forecast
B) All safety inspections and violations corrected
,C) Employee lunch breaks
D) Subcontractor phone numbers
Answer: B
Rationale: The log must document all safety inspections, hazards identified, and
corrective actions taken.
5. The SSM shall ensure the site safety log is signed and dated by whom?
A) Only the SSM
B) The SSM and the general contractor
C) The SSM and the site safety coordinator
D) The SSM daily and any relieving SSM
Answer: D
Rationale: Both the primary SSM and any relieving SSM must sign and date the log
daily.
6. How often must the site safety log be reviewed by the site safety manager?
A) Weekly
B) Daily
C) Monthly
D) Only after an incident
Answer: B
Rationale: The SSM is required to review and update the site safety log daily.
7. Failure to maintain a site safety log on site constitutes a violation of which NYC
Construction Code section?
A) Chapter 1
B) Chapter 33
C) Chapter 5
D) Chapter 10
Answer: B
Rationale: Chapter 33 (Safeguards During Construction or Demolition) mandates the
site safety log.
8. The site safety log shall be kept for a minimum of:
A) 6 months after project completion
B) 1 year after final inspection
C) 3 years after the final permit is signed off
D) 5 years
,Answer: C
Rationale: NYC regulations require retention of site safety logs for three years after final
permit sign-off.
9. Who is ultimately responsible for ensuring the site safety log is maintained and
accurate?
A) The project superintendent
B) The site safety manager (SSM)
C) The construction foreman
D) The building owner
Answer: B
Rationale: The SSM has ultimate responsibility for the site safety log's accuracy and
maintenance.
10. The site safety log must include the name of the:
A) Building owner
B) Project architect
C) Current and any relieving SSM with times
D) Material supplier
Answer: C
Rationale: The log must document the names and times of the current SSM and any
relieving personnel.
11. If the SSM is replaced permanently, the site safety log must document:
A) Reason for replacement
B) Name of new SSM and effective date
C) New SSM's certification number
D) All of the above
Answer: D
Rationale: Complete documentation of any permanent replacement is required for
accountability.
12. The DOB may demand immediate production of the site safety log during an
inspection. Failure to produce the log can result in:
A) Warning only
B) Stop-work order and fines
C) Reduction in permit fee
D) No penalty
Answer: B
Rationale: Failure to produce the site safety log is a serious violation that can result in
stop-work orders and fines.
, 13. Which regulation requires daily entries in the Site Safety Log Book?
A) OSHA 1904
B) 1 RCNY §3301-02
C) NYC Fire Code 1408
D) NFPA 101
Answer: B
Rationale: 1 RCNY §3301-02 specifies the requirements for daily log entries.
14. What should a Site Safety Log Book NOT include?
A) Time in/out of SSM
B) Daily work summary
C) Personal medical records
D) Safety activities performed
Answer: C
Rationale: Personal medical records are confidential and not part of the daily safety log.
15. Immediate notification to the DOB is required when:
A) There is a change in subcontractor
B) An accident or incident occurs on site
C) Supplies are delayed
D) A safety meeting is held
Answer: B
Rationale: All accidents/incidents must be reported to the DOB immediately.
Section 2: SSM Responsibilities & Qualifications (Questions 16–35)
16. What is the primary responsibility of a Site Safety Manager (SSM) in NYC
construction sites?
A) Conduct architectural design reviews
B) Perform daily payroll audits
C) Ensure compliance with site safety regulations
D) Approve building occupancy permits
Answer: C
Rationale: The SSM is primarily responsible for ensuring all construction activities
comply with NYC DOB safety regulations and site safety plans.
17. Which agency governs construction site safety regulations in New York City?
A) OSHA only
B) NYC Department of Buildings (DOB)