CLASS V ISSUE TURN IN AND RESIDUE
PROCESSING PROCEDURES FOR USING
UNITS ACTUAL PAPER 2026 QUESTIONS
WITH SOLUTIONS GRADED A+
⩥ Which Manual Accounting phase is more than 72 normal duty hours
and is performed at least annually?
a. Long Term
b. Short Term
c. Normal Term
d. Extended Term.
Answer: a. Long term
⩥ Materiel Management Flight responsibilities.
Answer: -stocking, storing, issuing, managing, inventorying
-Inspecting DoD supplies and equipment
-Primary liaison between customers and the AF Global Sustainment
Center
,⩥ Materiel Management Flight sections.
Answer: -Asset Management
-Maintenance Support
-Customer Support
⩥ Aircraft Parts Store (APS)/Mobile Readiness Spares Packages
(MRSP) Elements.
Answer: Receives, stores, and issues weapon system spares, conducts
warehouse validations and inventories, maintains central locator
function and performs
warehouse inspections. This element is normally located close to flight
line maintenance units
⩥ Central Storage Element.
Answer: Stores all in-warehouse supply and equipment items; selects
items to be issued, shipped or transferred; conducts warehouse
validations and inventories; maintains central locator function; performs
warehouse inspection function, and manages staging area for delivery of
items
⩥ Individual Protective Equipment (IPE).
Answer: Responsible for inspection, receipt, storage and issue of
mobility bags, base mobility small arms weapons, chemical warfare
,defense equipment, and gas masks/weapon support kits. Stores and
issues/transfers Individual Body Armor (IBA) to unit Equipment
Custodians and Responsible Persons (RPs)
⩥ Maintenance Support Section.
Answer: Monitors the overall maintenance and materiel interface,
resolves materiel support problems, review reports and coordinates
materiel management related training needs for decentralized materiel
support personnel
⩥ Asset Management Section.
Answer: Responsible for receiving, stocking, storing, selecting assets for
issues and shipments, inventorying, and inspecting DoD supplies and
equipment. AMS consists of the following elements: Aircraft Parts Store
(APS)/Mobility Readiness Spares Package (MSRP), Central Storage and
Individual Protective Equipment (IPE)
⩥ Customer Support Section.
Answer: acts as the materiel management liaison and equipment
accountability authority for wing customers
⩥ Responsibilities of the Equipment Accountability Office.
Answer: -Manages equipment items, with the exception of vehicles
-Loads indicators on & tracks all deployed equipment
-Conducts surveillance visits on all equipment accounts
, ⩥ Air Force receiving processes must comply with what regulation?.
Answer: DoD4140.1-R, DoD Supply Chain Materiel Management
Regulation
⩥ When receiving NWRM in the CONUS, within how many hours must
the LRS receiving supply account notify the gaining and losing NWRM
Accountable Officer (NWRMAO), Munitions Accountable Systems
Officer (MASO), AFSC , and /or Air Force Space Command Logistics
Support Center (AFSPC/LSC)?.
Answer: 2 hours
⩥ When receiving NWRM at OCONUS location, within how many
hours must the LRS receiving supply account notify the gaining and
losing NWRM Accountable Officer (NWRMAO), Munitions
Accountable Systems Officer (MASO), AFSC , and /or Air Force Space
Command Logistics Support Center (AFSPC/LSC)?.
Answer: 8 hours
⩥ C001, D071, D035E, D165B.
Answer:
⩥ Which of the following system's primary goal to dispatch images
generated by Standard Base Supply System/Enterprise Solution-Supply
application program?.
PROCESSING PROCEDURES FOR USING
UNITS ACTUAL PAPER 2026 QUESTIONS
WITH SOLUTIONS GRADED A+
⩥ Which Manual Accounting phase is more than 72 normal duty hours
and is performed at least annually?
a. Long Term
b. Short Term
c. Normal Term
d. Extended Term.
Answer: a. Long term
⩥ Materiel Management Flight responsibilities.
Answer: -stocking, storing, issuing, managing, inventorying
-Inspecting DoD supplies and equipment
-Primary liaison between customers and the AF Global Sustainment
Center
,⩥ Materiel Management Flight sections.
Answer: -Asset Management
-Maintenance Support
-Customer Support
⩥ Aircraft Parts Store (APS)/Mobile Readiness Spares Packages
(MRSP) Elements.
Answer: Receives, stores, and issues weapon system spares, conducts
warehouse validations and inventories, maintains central locator
function and performs
warehouse inspections. This element is normally located close to flight
line maintenance units
⩥ Central Storage Element.
Answer: Stores all in-warehouse supply and equipment items; selects
items to be issued, shipped or transferred; conducts warehouse
validations and inventories; maintains central locator function; performs
warehouse inspection function, and manages staging area for delivery of
items
⩥ Individual Protective Equipment (IPE).
Answer: Responsible for inspection, receipt, storage and issue of
mobility bags, base mobility small arms weapons, chemical warfare
,defense equipment, and gas masks/weapon support kits. Stores and
issues/transfers Individual Body Armor (IBA) to unit Equipment
Custodians and Responsible Persons (RPs)
⩥ Maintenance Support Section.
Answer: Monitors the overall maintenance and materiel interface,
resolves materiel support problems, review reports and coordinates
materiel management related training needs for decentralized materiel
support personnel
⩥ Asset Management Section.
Answer: Responsible for receiving, stocking, storing, selecting assets for
issues and shipments, inventorying, and inspecting DoD supplies and
equipment. AMS consists of the following elements: Aircraft Parts Store
(APS)/Mobility Readiness Spares Package (MSRP), Central Storage and
Individual Protective Equipment (IPE)
⩥ Customer Support Section.
Answer: acts as the materiel management liaison and equipment
accountability authority for wing customers
⩥ Responsibilities of the Equipment Accountability Office.
Answer: -Manages equipment items, with the exception of vehicles
-Loads indicators on & tracks all deployed equipment
-Conducts surveillance visits on all equipment accounts
, ⩥ Air Force receiving processes must comply with what regulation?.
Answer: DoD4140.1-R, DoD Supply Chain Materiel Management
Regulation
⩥ When receiving NWRM in the CONUS, within how many hours must
the LRS receiving supply account notify the gaining and losing NWRM
Accountable Officer (NWRMAO), Munitions Accountable Systems
Officer (MASO), AFSC , and /or Air Force Space Command Logistics
Support Center (AFSPC/LSC)?.
Answer: 2 hours
⩥ When receiving NWRM at OCONUS location, within how many
hours must the LRS receiving supply account notify the gaining and
losing NWRM Accountable Officer (NWRMAO), Munitions
Accountable Systems Officer (MASO), AFSC , and /or Air Force Space
Command Logistics Support Center (AFSPC/LSC)?.
Answer: 8 hours
⩥ C001, D071, D035E, D165B.
Answer:
⩥ Which of the following system's primary goal to dispatch images
generated by Standard Base Supply System/Enterprise Solution-Supply
application program?.