Advanced Practice Questions and Answers with Complete A+
Solutions 100% Correct!!!
What should you do if you need clarification on any part of the safety briefing? - correct
answer -Ask the COSS for clarification during or at the end of the briefing
Which of the following must be worn as a minimum requirement when 'on or near the line' -
correct answer -A safety helmet (hard hat)
Approved safety footwear
approved high visibility clothing on the upper body lower body
before you go on or near the line what must you do - correct answer -you must be waring
correct PPE
you must be briefed before going lineside and sign to confirm understanding of the briefing
You have followed your internal procedure to report something you felt was unsafe, but
nothing has been done. What should you ? - correct answer -Contact trade union
Ask your line manager
Contact CIRAS
1|Page
, When is it permitted to access an On-Track Plant or On-Track Machine exclusion zone? -
correct answer -When the OTP or OTM has stopped moving and when given permission by
the MC or CC
You see a hazard, such as overgrown vegetation, obstructing the CESS which has the
potential to cause harm. What should you do ? - correct answer -Tell the rest of your team
(including COSS)
Close call it
Mitigate the hazard if able to do so
name all the areas that identify the section of the railway that provide space between
sleepers, running rails alongside rails and between two running rails - correct answer -The
CESS
10 Foot
6 Foot
4 foot
2|Page