PCN-107 MIDTERM 2026 FULL QUESTIONS
WITH SOLUTIONS GRADED A+
⩥ AM must be equipped with what kind of vehicle.
Answer: 4x4 emergency response
⩥ Who can perform airfield checks.
Answer: AMOC and higher
⩥ When can an airfield check be conducted in lieu of inspection.
Answer: When airfield has been closed but needs to be reopened to
support emergencies or unscheduled missions
⩥ What does AM do when a significant amount of FOD is found on the
airfield.
Answer: Suspend airfield operations until area is cleared, notify airfield
sweeper, conduct another FOD check and resume operations after
completed
⩥ When to conduct BASH checks.
Answer: Prior to days flying activities and continue throughout the day
as needed
,⩥ Document this when conducting a BASH check.
Answer: BWC, time, weather, location, species, estimated number of
wildlife, dispersal method
⩥ What to do when BWC is increased.
Answer: Remain on airfield and monitor activity until BWC low is
reached
⩥ Who performs lighting checks.
Answer: AM or CE
⩥ The airfield lighting chart in the AFFSA website determines what?.
Answer: Number of lights allowed to be out before the system must be
turned off and NOTAM submitted
⩥ According to the AOI, why would airfield lighting be recalled.
Answer: To fix/repair light systems that have exceeded their allowable
outages
⩥ When to enter the construction area.
Answer: Only when absolutely necessary to safety of operations
⩥ Construction barricades.
,Answer: Define the limits of construction and hazardous areas and do
not violate wingtip clearance criteria
⩥ What is the distance between each construction barricade barrier.
Answer: Must not exceed 50ft
⩥ Stockpiled materials.
Answer: Must not violate any airfield clearance criteria and be lit at
night
⩥ Missing signs.
Answer: Ensure all signs and markings are present and viewable during
day and night
⩥ Equipment parking.
Answer: Must not violate any airfield clearance criteria and be lit at
night
⩥ FOD debris.
Answer: Must be continuously picked up around the work site
throughout the day
⩥ What must all supplies be secured against.
, Answer: Jet blast or high winds
⩥ When checking construction areas:.
Answer: Visually inspect areas
Notify AFM of discrepancies
Suspend/close area until fixed
Send a NOTAM
document on AF Form 3616
⩥ Runway surface condition (RSC).
Answer: Any form of precipitation that covers rwy surface
⩥ What is the RSC always reported to.
Answer: The nearest tenth of an inch
⩥ Wet Runway (WR).
Answer: Water is the only form of visible moisture on 25 percent or
more of the rwy
⩥ Slush on Rwy (SLR).
Answer: When slush is on rwy and ice or snow is not present
WITH SOLUTIONS GRADED A+
⩥ AM must be equipped with what kind of vehicle.
Answer: 4x4 emergency response
⩥ Who can perform airfield checks.
Answer: AMOC and higher
⩥ When can an airfield check be conducted in lieu of inspection.
Answer: When airfield has been closed but needs to be reopened to
support emergencies or unscheduled missions
⩥ What does AM do when a significant amount of FOD is found on the
airfield.
Answer: Suspend airfield operations until area is cleared, notify airfield
sweeper, conduct another FOD check and resume operations after
completed
⩥ When to conduct BASH checks.
Answer: Prior to days flying activities and continue throughout the day
as needed
,⩥ Document this when conducting a BASH check.
Answer: BWC, time, weather, location, species, estimated number of
wildlife, dispersal method
⩥ What to do when BWC is increased.
Answer: Remain on airfield and monitor activity until BWC low is
reached
⩥ Who performs lighting checks.
Answer: AM or CE
⩥ The airfield lighting chart in the AFFSA website determines what?.
Answer: Number of lights allowed to be out before the system must be
turned off and NOTAM submitted
⩥ According to the AOI, why would airfield lighting be recalled.
Answer: To fix/repair light systems that have exceeded their allowable
outages
⩥ When to enter the construction area.
Answer: Only when absolutely necessary to safety of operations
⩥ Construction barricades.
,Answer: Define the limits of construction and hazardous areas and do
not violate wingtip clearance criteria
⩥ What is the distance between each construction barricade barrier.
Answer: Must not exceed 50ft
⩥ Stockpiled materials.
Answer: Must not violate any airfield clearance criteria and be lit at
night
⩥ Missing signs.
Answer: Ensure all signs and markings are present and viewable during
day and night
⩥ Equipment parking.
Answer: Must not violate any airfield clearance criteria and be lit at
night
⩥ FOD debris.
Answer: Must be continuously picked up around the work site
throughout the day
⩥ What must all supplies be secured against.
, Answer: Jet blast or high winds
⩥ When checking construction areas:.
Answer: Visually inspect areas
Notify AFM of discrepancies
Suspend/close area until fixed
Send a NOTAM
document on AF Form 3616
⩥ Runway surface condition (RSC).
Answer: Any form of precipitation that covers rwy surface
⩥ What is the RSC always reported to.
Answer: The nearest tenth of an inch
⩥ Wet Runway (WR).
Answer: Water is the only form of visible moisture on 25 percent or
more of the rwy
⩥ Slush on Rwy (SLR).
Answer: When slush is on rwy and ice or snow is not present