Completes Preliminary Design - CORRECT ANSWER-What does the Technology Maturation and
Risk Reduction Phase demonstrate?
-Competitive prototyping
-Preliminary Design Review
-Capability Development Document validation
-Sustainment Plan
-Technology Readiness Assessment - CORRECT ANSWER-What are the major activities in the
Technology Maturation and Risk Reduction (TMRR) phase?
KPPs and KSAs are documented in the CDD which guide efforts leading to the Preliminary Design
Review - CORRECT ANSWER-Where are KPPs and KSAs doccumented?
The MDA
-Authorizes entry into and contract award for EMD
, -Formal initiation of the program
-Approves the Acquisition Program Baseline
-Approves LRIP quantities - CORRECT ANSWER-What occurrs at MS B?
-Complete HW and SW design
-Build/test prototypes
-Complete TEMP DT&E activities
-Evaluate achievement of KPPs/KSAs
-Operational Assessments by Operational Test Agency
-Ensure system design/support meet sustainment reqs - CORRECT ANSWER-What are the key
activities during the Engineering & Manufacturing Development phase?
-When the design is stable
-Systems meet the requirements (met through DT/OT)
-Manufaturing process demonstrated and industrial capabilies are reasonabiliy available
*EMD often continues past initial production/fielding until all EMD activites have been
completed - CORRECT ANSWER-When does the EMD phase end?
-Updated Acquisition Strategy
-Stable design demonstrated
-Operational Assessment
-Validated CPD
-Demonstrated interoperability
-Demonstrated operational supportability - CORRECT ANSWER-What is included/demonstrated
at MS C?