QUESTIONS AND VERIFIED CORRECT
ANSWERS GRADED A+ LATEST 100%
GUARANTEED PASS
Which KPP covers cybersecurity requirements? - CORRECT ANSWER-System Survivability KPP
Seeks to
-Prevent or thwart attacks
-Mitigate or reduce vulnerabilities
-Recover to known good condition
What are inherently governmental activities? - CORRECT ANSWER-An activity that is so
intimately related to the public interest as to mandate performance by government personnel,
such as Program Managers, Integrated Product Team Leads, Contracting
What is sufficient internal capability? - CORRECT ANSWER-Requires the agency to have an
adequate number of positions filled by Federal employees with appropriate training,
experience, and expertise
When do you consider Corrosion Prevention Control (CPC) and why? - CORRECT ANSWER-
Corrosion Prevention and Control (CPC) is important in the early stages in a system
development
-Greatest influence on total cost of ownership TOC
,-Can balance tech opportunities with operational and sustainment rqts
When is the Corrosion Prevention and Control (CPC) drafted and when is it required? - CORRECT
ANSWER-CPC will be drafted during the Materiel Solution Analysis phase and is required prior
to MS B
What are some of the key activities in Corrosion Prevention and Control (CPC) planning? -
CORRECT ANSWER-Key Activities in CPC Planning include:
-Establish Corrosion Prevention Team (CPT)
-Create documentation to implement CPC planning
-Include CPC considerations in source selection criteria
-Designing, manufacturing, testing, and supporting of the system
What are some general design and technical considerations for Corrosion Prevention and
Control (CPC)? - CORRECT ANSWER-General Design and Technical Considerations:
-Material Selections
-Protective Coatings
-Design Geometries
-Environmental Mitigation
-Process/Finish Specification
-Environmental Factors(wind, rain, sand, salt, humidity)
-System Operational Tempo
Where is Corrosion Prevention and Control documented and implemented? - CORRECT
ANSWER-Corrosion Prevention Control Plan (CPCP)
Life Cycle Sustainment Plan (LCSP)
Systems Engineering Plan (SEP)
, Where are industrial based capabilities addressed? - CORRECT ANSWER-In the Acquisition
Strategy
What is the purpose of Working Level IPTs? - CORRECT ANSWER-Coordinate and resolve issues
with external stakeholders
What is the purpose of an MOA? - CORRECT ANSWER-Specify relationships and responsibilities
of stakeholders
What does the industrial base capability assessment evaluate? - CORRECT ANSWER--Capability:
Ability to produce systems
-Capacity: Ability to build at required rates and quantities
-Financial Stability: Viability of manufacturers
-Diminishing Manufacturing Sources and Material Shortages
What does updating the industrial base capability assessment provide? - CORRECT ANSWER-
Continuous monitoring of high risk items such as supply chain managment and obsolescence
What is needed for a New Start? - CORRECT ANSWER-Congressional approval (DD 1415-1) for
RDT&E > $10M
Congressional Notification for RDT&E < $10M
What is a Technology Readiness Assessment (TRA)? - CORRECT ANSWER-A regulatory
requirement for all Major Defense Acquisition Programs (MDAPs) at Milestone (MS) B to
determine the Technology Readiness Level (TRL) of critical technology elements (CTE)