VERIFIED CORRECT ANSWERS
GRADED A+ LATEST 100%
GUARANTEED PASS
Pre-MDD Technology Opportunities - CORRECT ANSWER-- All sources foreign and domestic
- SBIR
- S&T activities
- ATDs
- JCTDs
- Joint Warfighting Experiments
Following The MDD... - CORRECT ANSWER-The MDA determines entry point into the acquisition
management system
Materiel Development Decision (MDD) - CORRECT ANSWER-Approval to enter the Acquisition
Process
Says there is a new product needed and analyzing alternatives will now occur
Materiel Solution Analysis (MSA) Phase purpose - CORRECT ANSWER-Assess potential materiel
solution
Materiel Solution Analysis (MSA) Phase guided by - CORRECT ANSWER-- Validated ICD
,- AoA Study Plan
Materiel Solution Analysis (MSA) Phase major activities - CORRECT ANSWER-- PMO established
(PM Selected by CAE)
− Conduct AoA
− Develop Acquisition Strategy (AS)
− Draft Capabilities Development Document (CDD)
− Translate capability gaps into system specific requirements
− Independent Technical Risk Assessment (ITRA)
Materiel Solution Analysis (MSA) Phase minimum funding - CORRECT ANSWER-For all Phase
activities and to support MS A decision
Materiel Solution Analysis (MSA) Phase complete when... - CORRECT ANSWER-MDA approves
materiel solution and Acquisition Strategy
At Milestone A, the PM presents... - CORRECT ANSWER-Acquisition Strategy which includes:
- Acquisition approach and business strategy
- Risk management
- Contract strategy
- Intellectual Property (IP) strategy
- Modular Open Systems Approach (MOSA)
- Framing assumptions
- "Should cost" targets
Milestone A Component - CORRECT ANSWER-Presents affordability analysis and affordability
goals
, Milestone A MDA actions - CORRECT ANSWER-Makes a determination on:
- the materiel solution
- release of TMRR RFP
- exit criteria for the TMRR Phase
At MS A, the MDA certifies that... - CORRECT ANSWER-- Approved ICD
- program is being executed by an entity with a relevant core
competency
- If system duplication occurs, it is necessary & appropriate
- Core depot-level maintenance
- AoA performed
- Cost estimate submitted, with the concurrence of DCAPE
- Program is consistent with priority level assigned by the JROC
TMRR Phase guided by - CORRECT ANSWER-- Acquisition Strategy
- Draft CDD
- SEP
TMRR Phase purpose - CORRECT ANSWER-- Reduce Technology, Engineering, Integration, and
Life Cycle Cost Risks
- Demonstrate Critical Technologies on Prototypes
- Complete Preliminary Design
TMRR Phase entry - CORRECT ANSWER-MDA approved materiel solution and Acquisition
Strategy