CONSTRUCTION QUALITY MANAGEMENT FOR
CONTRACTORS (CQM-C) EXAM WITH 100 REAL EXAM
QUESTIONS AND CORRECT VERIFIED ANSWERS/
ALREADY GRADED A+ (MOST RECENT!!)
1. What is the primary purpose of the CQM-C certification?
A) To reduce construction costs by 20%
B) To ensure contractors understand and implement the three-
phase quality control system
C) To replace government quality assurance personnel
D) To speed up project completion
Correct Answer: B
Rationale: The CQM-C certification is required by USACE and
NAVFAC to ensure that contractor QC personnel understand and
properly execute the mandatory three-phase quality control
system (Preparatory, Initial, Follow-up). It is not about cost
reduction, replacing QA, or merely speeding up work—it is
about achieving contractual quality standards.
1
,2. Under the CQM system, who is ultimately responsible for
quality control?
A) Government QA officer
B) Resident Engineer
C) Contractor
D) Subcontractor
Correct Answer: C
Rationale: The contract places full responsibility for quality
control on the prime contractor. The government’s QA role is to
verify the effectiveness of the contractor’s QC system, not to
perform QC. Subcontractors work under the prime’s QC system.
3. The Government’s quality assurance (QA) role is to:
A) Direct the contractor’s daily work
B) Approve all submittals
C) Verify that the contractor’s QC system is effective
D) Perform destructive testing
Correct Answer: C
Rationale: Government QA monitors and evaluates the
contractor’s QC activities to ensure they comply with contract
requirements. QA does not direct work, does not approve
2
,submittals (the government does that as part of contract
administration), and does not perform the contractor’s required
testing.
4. What document formally establishes the contractor’s QC
organization?
A) Project schedule
B) Quality Control Plan (QCP)
C) Safety plan
D) Submittal log
Correct Answer: B
Rationale: The Quality Control Plan (QCP) is a written document
submitted by the contractor and approved by the government. It
describes the QC organization, personnel, authorities,
procedures, testing, documentation, and the three-phase control
system for all definable features of work.
5. The CQC System must be approved by the Government:
A) After construction starts
B) Before any construction begins
3
, C) At project completion
D) Never, if contractor is experienced
Correct Answer: B
Rationale: Per USACE Engineer Regulation (ER) 1180-1-6, no
construction work may begin until the contractor’s Quality Control
Plan has been submitted and approved by the Contracting
Officer. This ensures quality controls are in place before any
field operations commence.
6. Who is the minimum required QC representative on site?
A) Any superintendent
B) The Project Manager
C) A designated CQC System Manager (often called QC
Manager)
D) Safety officer
Correct Answer: C
Rationale: The contract requires a named individual (the CQC
System Manager or QC Manager) who is responsible for
implementing the QC plan. This person must be on site during
construction activities. Superintendents and project managers
4