1. All of the following require local building permits except a project:
A. On federal or state owned property
B. Contracted for less than $2,500
C. Being done by the property owner personally
D. That does not affect public health or safety - Correct Answer: A.
On federal or state owned property
2. Who has jurisdiction over the inspection of amusement rides?
A. Building Department
B. Department of Agriculture and Consumer Services
C. Department of Financial Services
D. Department of Game and Commission - Correct Answer: B.
Department Agriculture and Consumer Services
3. All of the following operations can be performed without obtaining a permit
except:
A. Replace a load management control device
B. Install a portable cooling unit
, C. Install a self-contained refrigeration system containing 18 pounds of
refrigerant and actuated by a 1.75 hp motor
D. Replace chilled water piping within existing cooling equipment -
Correct Answer: C. Install a self-contained refrigeration system
containing 18 pounds of refrigerant and actuated by a 1.75 hp motor
4. According to the Florida Building Code, when repairs must be performed in
an emergency situation, the permit application shall be submitted within
___________ to the building official.
A. 5 days from completion
B. The next working day
C. 5 days from commencement
D. 7 days from commencement - Correct Answer: B. The next
working day
5. Who shall examine, or cause to be examined, applications for permit?
A. Building official
B. Building department
C. Architect
D. Contractor - Correct Answer: A. Building Official
6. An application for a permit for any proposed work, shall be deemed to have
been abandoned ________ after the date of filing for the permit, unless
before then, a permit has been issued.
A. 90 days
B. 120 days
C. 180 days
D. 1 year - Correct Answer: C. 180 days
,7. According to Florida Building Code, if no time extension is granted, how
long does the contractor have to start construction before the permit
expires?
A. 60 days
B. 90 days
C. 180 days
D. 365 days - Correct Answer: C. 180 days
8. When is removal of asbestos-containing materials on a residential building
where the owner occupies and where the building is not for sale or lease
allowed by the owner?
A. Only when the owner hires a licensed asbestos abatement contractor
B. Only if less than 4 cubic feet of asbestos-containing material is
removed
C. Only if the owner requests an exemption and personally signs the
building permit application
D. Under no circumstances - Correct Answer: C. Only if the owner
requests an exemption and personally signs the building permit
application
9. A homeowner may act as his own asbestos abatement contractor on his
own personal residence or:
A. Farm outbuildings of the same property
B. A rental property renovation
C. A property being renovated for sale
D. How own business property - Correct Answer: A. Farm
outbuildings of the same property
10.According to the Florida Building Code, every permit issued shall become
invalid unless the work authorized by such permit is commenced within
, ____ days after its issuance, unless an extension of time has been allowed
by the building official.
A. 30 days
B. 45 days
C. 60 days
D. 6 months - Correct Answer: D. 6 months
11.Work shall be considered to be in active progress when the permit has
received an approved inspection within:
A. 180 days
B. 60 days
C. 30 days
D. 30 days from last failed inspection - Correct Answer: A. 180 days
12.Where shall a permanent sign which identifies the termite treatment
provider be located?
A. With the building permit
B. Near the air conditioning unit
C. Near the water heater or electric panel
D. With the building department - Correct Answer: C. Near the
water heater or electric panel
13.When submitting the application for a construction permit, which of the
following is responsible to determine that the documents are in compliance
with all building codes, statutes, and ordinances?
A. Construction lender
B. Building official
C. Contractor
D. Architect - Correct Answer: B. Building official