Operations Management An Integrated Approach International Adaptation 8th Edition Reid SOLUTION MANUAL PDF

Institution
Course

Content preview

,SOLUTION MANUAL FOR Operations Management
An Integrated Approach, International Adaptation,
8th Edition Reid
Notes
1- The file is chapter after chapter.
2- We have shown you few pages sample.
3- The file contains all Appendix and Excel sheet
if it exists.
4- We have all what you need, we make update
at every time. There are many new editions
waiting you.
5- If you think you purchased the wrong file You
can contact us at every time, we can replace it
with true one.
Our email:


,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


Solutions Manual

Chapter 2: Operations Strategy and Competitiveness


1. Two machines are used to put packets on shelves in the warehouse; one can place
1000 packets in 30 minutes, while the second can put 900 packets in 20 minutes.
Which machine is more productive?

Answer:
Productivity of machine 1 = 1000 packets/30 minutes
= 33.3 packets per minute

Productivity of machine 2 = 900 packets/20 minutes
= 450 packets per minute

Machine 2 is more productive.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 2 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-1

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


2. A worker typically completes packing 30 packs in a day. However, currently, the
worker completes 80 packs in three days. Did the workers’ productivity improve?

Answer:
Productivity in worker before = 30 packs / 1 day = 30 packs per day
Productivity in worker after = 80 packs / 3 days = 26.7 houses per day
The workers productivity decreased.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 2 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-2

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


3. One painter can paint 200 square feet of wall in three hours. The second painter
can paint 150 square feet of wall in two hours. Which painter is more productive?

Answer:
For the first painter: 2 square feet in 3 hours = 200/3 = 66.67 approx square feet

per hour.

For the second painter: 150 square feet in 2 hours = 150/2= 75 square feet per

hour.

Comparing the two rates: First painter: ~66.67 square feet/hour and Second

painter: 75 square feet/hour

The second painter is more productive, painting 75 square feet per hour compared

to the first painter's approximately 66.67 square feet per hour.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 2 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-3

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual



4. A firm makes dining chairs in Units 1 and 2. At Unit 1, five workers produced 250
chairs. At Unit 2, six workers produced 280 chairs during the same time period.
Which facility was more productive?


Answer:

Productivity at unit #1 = 250 chairs / 5 workers = 50 chairs per worker



Productivity at unit #2 = 280 chairs / 6 workers = 46.7 chairs per worker



Unit #1 was more productive.



Section: Productivity

Subsection: Interpreting Productivity Measures

LO: 2.5 Define productivity and identify productivity measures.

Bloom’s: Application

AACSB: Analytic

Time on task: 2 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-4

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


5. A painter is considering using a new high-tech paint roller. Yesterday he was able
to paint three walls in 45 minutes using his current roller. Today he painted two
walls of the same size in 20 minutes. Is the painter more productive using the new
paint roller?

Answer:
Productivity using old method = 3 walls / 45 minutes = 0.07 walls per minute

Productivity using new method = 2 walls / 20 minutes = 0.10 walls per minute

The painter is more productive using the new paint roller.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 2 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-5

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


6. Aztec Furnishings makes hand-crafted furniture for sale in its retail stores. The
furniture maker has recently installed a new assembly process, including a new
sander and polisher. With this new system, production has increased to 95 pieces
of furniture per day from the previous 55 pieces of furniture per day. The number
of defective items produced has dropped from 8 pieces per day to 2 per day. The
production facility operates strictly eight hours per day. Evaluate the change in
productivity for Aztec using the new assembly process.

Answer:
Using only the non-defective production, productivity has increased from (55 – 8)
= 47 pieces per day to (95 – 2) = 93 pieces per day.

Change in productivity = (93 – 47)/47 × 100% = 97.9%
There is a 97.9% increase in productivity using the new assembly process.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 3 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-6

,Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


7. Howard Plastics produces plastic containers for use in the food packaging
industry. Last year its average monthly production included 20,000 containers
produced using one shift five days a week with an eight-hour-a-day operation. Of
the items produced 15 percent were deemed defective. Recently, Howard Plastics
has implemented new production methods and a new quality improvement
program. Its monthly production has increased to 25,000 containers with 9 percent
defective.
a) Compute productivity ratios for the old and new production system.
b) Compare the changes in productivity between the two production systems.

Answer:
a) Using only the nondetective production, productivity increased from (20,000 ×
0.85) = 17,000 units/month to (25,000 × 0.91) = 22,750 units/month.

b) Change in productivity = (22,750 – 17,000)/17,000 × 100% = 33.8%
There is a 33.8% increase in productivity using the new production method.

Section: Productivity
Subsection: Interpreting Productivity Measures
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 4 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-7

, Reid & Sanders Operations Management, 8th Edition, International Adaptation
Solutions Manual


8. Med-Tech labs is a facility that provides medical tests and evaluations for
patients, ranging from analyzing blood samples to performing magnetic resonance
imaging (MRI). Average price to patients is $85 per patient. Labor costs average
$18 per patient, materials costs are $22 per patient, and overhead costs are
averaged at $20 per patient.
a) What is the multifactor productivity ratio for Med-Tech? What does your
finding mean?
b) If the average lab worker spends four hours for each patient, what is the labor
productivity ratio?

Answer:
a) Multifactor productivity = $85/($18 + $22 + $20) = 1.42
This means that the lab is charging approximately 42% over the expenses of
labor, materials, and overhead.

b) Labor productivity = $85/4 hours = $21.25 per hour

Section: Productivity
Subsection: Measuring Productivity
LO: 2.5 Define productivity and identify productivity measures.
Bloom’s: Application
AACSB: Analytic
Time on task: 4 minutes




© 2024 John Wiley & Sons, Inc. All rights reserved. SM 2-8

Written for

Course

Document information

Uploaded on
May 17, 2026
Number of pages
387
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
TestbanksExperts

Get to know the seller

Seller avatar
TestbanksExperts Ball state University
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
1 month
Number of followers
1
Documents
618
Last sold
5 days ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions