◉Accuracy. Answer: Within the quality management system, it is an
assessment of correctness
◉Activity List. Answer: A documented tabulation of schedule
activities that shows the activity description, activity identifier, and a
sufficiently detailed scope of work description so project team
members understand what work is to be performed
◉Actual Cost (AC). Answer: The realized cost incurred for the work
performed on an activity during a specific time period
◉Adaptive Approach. Answer: A development approach in which
the requirements are subject to a high level of uncertainty and
volatility and are likely to change throughout the project
◉Affinity Diagram. Answer: A diagram that shows large numbers of
ideas classified into groups for review and analysis
,◉Affinity Grouping. Answer: The process of classifying items into
similar categories or collections on the basis of their likeness
◉Agile. Answer: A term used to describe a mindset of values and
principles as set forth in the Agile Manifesto
◉Alternatives Analysis. Answer: A method used to evaluate
identified options in order to select the options or approaches to use
to perform the work of the project
◉Ambiguity. Answer: A state of being unclear, having difficulty in
identifying the cause of events, or having multiple options from
which to choose
◉Analogous Estimating. Answer: A method for estimating the
duration or cost of an activity or a project using historical data from
a similar activity or project
◉Artifact. Answer: A template, document, output, or project
deliverable
◉Assumption. Answer: A factor in the planning process that is
considered to be true, real, or certain, without proof or
demonstration
,◉Assumption and Constraint Analysis. Answer: An assessment that
ensures assumptions and constraints are integrated into the project
plans and documents, and that there is consistency among them
◉Assumption Log. Answer: A project document used to record all
assumptions and constraints throughout the project
◉Authority. Answer: The right to apply project resources, expend
funds, make decisions, or give approvals
◉Backlog. Answer: An ordered list of work to be done
◉Backlog Refinement. Answer: Progressive elaboration of the
content in the backlog and (re)prioritization of it to identify the
work that can be accomplished in an upcoming iteration
◉Baseline. Answer: The approved version of a work product, used
as a basis for comparison to actual results
◉Basis of Estimates. Answer: Supporting documentation outlining
the details used in establishing project estimates such as
assumptions, constraints, level of detail, ranges, and confidence
levels
, ◉Benchmarking. Answer: The comparison of actual or planned
products, processes, and practices to those of comparable
organizations to identify best practices, generate ideas for
improvement, and provide a basis for measuring performance
◉Benefits Management Plan. Answer: The documented explanation
defining the processes for creating, maximizing, and sustaining the
benefits provided by a project or program
◉Bid Documents. Answer: All documents used to solicit
information, quotations, or proposals from prospective sellers
◉Bidder Conference. Answer: The meetings with prospective sellers
prior to the preparation of a bid or proposal to ensure all
prospective vendors have a clear and common understanding of the
procurement. Also known as contractor conferences, vendor
conferences, or pre-bid conferences
◉Blocker. Answer: An obstacle that prevents the team from
achieving its objectives. Also known as an impediment
◉Budget. Answer: The approved estimate for the project or any
work breakdown structure (WBS) component or any schedule
activity
GUIDE GRADED A+
◉Accuracy. Answer: Within the quality management system, it is an
assessment of correctness
◉Activity List. Answer: A documented tabulation of schedule
activities that shows the activity description, activity identifier, and a
sufficiently detailed scope of work description so project team
members understand what work is to be performed
◉Actual Cost (AC). Answer: The realized cost incurred for the work
performed on an activity during a specific time period
◉Adaptive Approach. Answer: A development approach in which
the requirements are subject to a high level of uncertainty and
volatility and are likely to change throughout the project
◉Affinity Diagram. Answer: A diagram that shows large numbers of
ideas classified into groups for review and analysis
,◉Affinity Grouping. Answer: The process of classifying items into
similar categories or collections on the basis of their likeness
◉Agile. Answer: A term used to describe a mindset of values and
principles as set forth in the Agile Manifesto
◉Alternatives Analysis. Answer: A method used to evaluate
identified options in order to select the options or approaches to use
to perform the work of the project
◉Ambiguity. Answer: A state of being unclear, having difficulty in
identifying the cause of events, or having multiple options from
which to choose
◉Analogous Estimating. Answer: A method for estimating the
duration or cost of an activity or a project using historical data from
a similar activity or project
◉Artifact. Answer: A template, document, output, or project
deliverable
◉Assumption. Answer: A factor in the planning process that is
considered to be true, real, or certain, without proof or
demonstration
,◉Assumption and Constraint Analysis. Answer: An assessment that
ensures assumptions and constraints are integrated into the project
plans and documents, and that there is consistency among them
◉Assumption Log. Answer: A project document used to record all
assumptions and constraints throughout the project
◉Authority. Answer: The right to apply project resources, expend
funds, make decisions, or give approvals
◉Backlog. Answer: An ordered list of work to be done
◉Backlog Refinement. Answer: Progressive elaboration of the
content in the backlog and (re)prioritization of it to identify the
work that can be accomplished in an upcoming iteration
◉Baseline. Answer: The approved version of a work product, used
as a basis for comparison to actual results
◉Basis of Estimates. Answer: Supporting documentation outlining
the details used in establishing project estimates such as
assumptions, constraints, level of detail, ranges, and confidence
levels
, ◉Benchmarking. Answer: The comparison of actual or planned
products, processes, and practices to those of comparable
organizations to identify best practices, generate ideas for
improvement, and provide a basis for measuring performance
◉Benefits Management Plan. Answer: The documented explanation
defining the processes for creating, maximizing, and sustaining the
benefits provided by a project or program
◉Bid Documents. Answer: All documents used to solicit
information, quotations, or proposals from prospective sellers
◉Bidder Conference. Answer: The meetings with prospective sellers
prior to the preparation of a bid or proposal to ensure all
prospective vendors have a clear and common understanding of the
procurement. Also known as contractor conferences, vendor
conferences, or pre-bid conferences
◉Blocker. Answer: An obstacle that prevents the team from
achieving its objectives. Also known as an impediment
◉Budget. Answer: The approved estimate for the project or any
work breakdown structure (WBS) component or any schedule
activity