EXAM QUESTIONS AND CORRECT ANSWERS
(VERIFIED ANSWERS) Q&A 2026|INSTANT
DOWNLOAD PDF
1. What is the primary responsibility of a general contractor
on a construction project?
A. Selling construction materials
B. Supervising and coordinating the entire project
C. Designing architectural plans
D. Inspecting tax records
Rationale: General contractors oversee labor, materials,
schedules, and subcontractors to ensure project completion.
Correct Answer: B. Supervising and coordinating the entire
project
2. Which document legally defines the scope of work between
owner and contractor?
A. Building permit
B. Contract agreement
C. Inspection report
D. Payroll sheet
,Rationale: The contract establishes responsibilities, timelines,
costs, and legal obligations.
Correct Answer: B. Contract agreement
3. What does OSHA primarily regulate?
A. Employee wages
B. Workplace safety and health
C. Architectural licensing
D. Tax collection
Rationale: OSHA establishes and enforces workplace safety
standards.
Correct Answer: B. Workplace safety and health
4. What is the purpose of a building permit?
A. To authorize financing
B. To verify compliance with building codes
C. To hire subcontractors
D. To reduce insurance costs
Rationale: Permits ensure construction complies with safety
and code requirements.
Correct Answer: B. To verify compliance with building codes
,5. Which project delivery method involves the contractor
providing both design and construction services?
A. Design-bid-build
B. Construction management
C. Design-build
D. Lump-sum bidding
Rationale: Design-build combines design and construction
responsibilities under one contract.
Correct Answer: C. Design-build
6. What is a subcontractor?
A. A project owner
B. A contractor hired to perform specialized work
C. A building inspector
D. A material supplier
Rationale: Subcontractors specialize in trades such as plumbing,
electrical, or HVAC.
Correct Answer: B. A contractor hired to perform specialized
work
7. What is the purpose of construction drawings?
A. To advertise the project
B. To provide detailed instructions for construction
, C. To calculate taxes
D. To estimate employee salaries
Rationale: Drawings communicate dimensions, materials, and
construction details.
Correct Answer: B. To provide detailed instructions for
construction
8. What type of contract provides a fixed total project price?
A. Cost-plus contract
B. Time and materials contract
C. Lump-sum contract
D. Unit price contract
Rationale: Lump-sum contracts specify one fixed project cost.
Correct Answer: C. Lump-sum contract
9. What does “RFI” stand for in construction?
A. Request for Inspection
B. Request for Information
C. Review for Installation
D. Report for Insurance
Rationale: RFIs are used to clarify plans, specifications, or
project details.
Correct Answer: B. Request for Information