QSP EXAM STUDY QUESTIONS WITH CORRECT
VERIFIED SOLUTIONS 100% GUARANTEED
PASS (LATEST UPDATE)
Once identified, dischargers shall begin implementing repairs or design changes
to BMPs:
a. Immediately
b. Within 24 hours
c. Within 48 hours
d. ASAP, but not more than 72 hours - ANS ✓d. ASAP, but not more than 72 hours
Permit Registration Documents (PRDs) shall consist of all of the following except:
a. Site Map
b. Signed Certification Statement
c. Risk Assessment
d. Notice of Termination (NOT)
e. Notice of Intent (NOI) - ANS ✓d. Notice of Termination (NOT)
Project sediment risk is:
a. the relative amount of sediment that can be discharged, driven largely by
scheduling and site characteristics
b. the risk sediment discharges pose to the receiving waters. - ANS ✓a. the
relative amount of sediment that can be discharged, driven largely by scheduling
and site characteristics
1
QSP EXAM
,QSP
Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - ANS ✓b. Sampling for
pH and turbidity
Stockpiles require a linear sediment barrier at all times, and must be covered
prior to a rain event or when inactive. A stockpile is inactive after __days of
inactivity.
a. 3
b. 7
c. 10
d. 14 - ANS ✓d. 14
The amount of eroded soil that settles out at a point in the watershed that is
remote from the origin of the detached soil particles is...
a. Rainfall Erosivity Factor
b. Slope Length and Steepness Factors
c. Soil Cover Factor
d. Sediment Yield - ANS ✓d. Sediment Yield
The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __
hours prior to any likely precipitation event.
a. Immediately
b. 24 hours
2
QSP EXAM
, QSP
c. 48 hours
d. ASAP but not more than 72 hours - ANS ✓c. 48 hours
The FOUR phases of construction include, all of the following EXCEPT:
a. Streets and Utility Phase
b. Vertical Construction Phase
c. Stormwater Sampling
d. Grading and Land Development Phase
e. Final landscaping and Site Stabilization Phase - ANS ✓c. Stormwater Sampling
The R factor accounts for:
a. Project location, length of construction period, and time of year
b. Project schedule
c. Historical rain events
d. Potential pollutants on site - ANS ✓a. Project location, length of construction
period, and time of year
The REAP must be onsite during construction and available
a. for a minimum of 1 Year
b. for a minimum of 3 Years
c. 72 hours prior to any likely precipitation event
d. Until the end of the construction project - ANS ✓b. for a minimum of 3 Years
The removal of a uniform thin layer of soil by raindrop splash or water run-off
is...
3
QSP EXAM