The following are the challenges facing the construction industry today, except -
ANSWER-decreasing demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction
contract. - ANSWER-scope of project
a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. -
ANSWER-shop drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order
for materials and equipment. - ANSWER-buy out
a request made by the owner to add or subtract features to the scope of the project
resulting in changes to the contract - ANSWER-change order
a daily amount of money paid by the contractor to the owner for each day that the
project fails to meet the completion date specified in the contract - ANSWER-liquidated
damage
a change or addition to the contract documents issued after the documents have been
released but before the bids are due - ANSWER-addenda
a contract document set consists of - ANSWER-an agreement, construction drawings,
specifications, addenda, general and supplementary condition
, the shop drawings are prepared by the - ANSWER-architect
in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - ANSWER-general contractor
what is the first known recorded building code that outlines the roles and duties of the
master builder - ANSWER-code of hammurabi
in the construction management (CM) method of project delivery, there is normally no
general contractor - ANSWER-true
in the construction management at risk (CMAR) method of project delivery, the
construction manager - ANSWER-manages the project's construction during the
construction phase
what project delivery method in which only one firm is contracted for both design and
construction of the project - ANSWER-design-build
what delivery method is best used if highly technical in nature of the project that
requires good communication and coordination need to occur between designers and
builder? - ANSWER-Design-build
what delivery method in which there is no or limited input from contractors and
subcontractors during the design phase? - ANSWER-Design-Bid-Build
Turnkey method is a variation of what delivery method when it also involves arranging
for land and financing of the project? - ANSWER-Design-Build
what delivery method in which it is hard to get real up-front fixed price, or price may not
be known until it is actually built? - ANSWER-design-build
what delivery method in which the owner assumes full responsibility on all liability risk
during construction stage? - ANSWER-CM
Questions and CorreCt ansWers (veriFied) | latest
uPdate 2026/2027 | graded a+ | Brand neW | 100%
guaranteed Pass
The following are the challenges facing the construction industry today, except -
ANSWER-decreasing demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction
contract. - ANSWER-scope of project
a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. -
ANSWER-shop drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order
for materials and equipment. - ANSWER-buy out
a request made by the owner to add or subtract features to the scope of the project
resulting in changes to the contract - ANSWER-change order
a daily amount of money paid by the contractor to the owner for each day that the
project fails to meet the completion date specified in the contract - ANSWER-liquidated
damage
a change or addition to the contract documents issued after the documents have been
released but before the bids are due - ANSWER-addenda
a contract document set consists of - ANSWER-an agreement, construction drawings,
specifications, addenda, general and supplementary condition
, the shop drawings are prepared by the - ANSWER-architect
in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - ANSWER-general contractor
what is the first known recorded building code that outlines the roles and duties of the
master builder - ANSWER-code of hammurabi
in the construction management (CM) method of project delivery, there is normally no
general contractor - ANSWER-true
in the construction management at risk (CMAR) method of project delivery, the
construction manager - ANSWER-manages the project's construction during the
construction phase
what project delivery method in which only one firm is contracted for both design and
construction of the project - ANSWER-design-build
what delivery method is best used if highly technical in nature of the project that
requires good communication and coordination need to occur between designers and
builder? - ANSWER-Design-build
what delivery method in which there is no or limited input from contractors and
subcontractors during the design phase? - ANSWER-Design-Bid-Build
Turnkey method is a variation of what delivery method when it also involves arranging
for land and financing of the project? - ANSWER-Design-Build
what delivery method in which it is hard to get real up-front fixed price, or price may not
be known until it is actually built? - ANSWER-design-build
what delivery method in which the owner assumes full responsibility on all liability risk
during construction stage? - ANSWER-CM