2. OSℎA PEL for asbestosoveran 8-ℎour TWA: 0.1fibersper cubiccentimeter
3. OSℎA PEL for asbestos over an 8-ℎour TWA: 0.5 fibers per liter
4. OSℎA PEL for asbestosover an 8-ℎour TWA: 0.01 fibers per cubic meter
5. Cal/OS ℎA section covering construction asbestos standards: Title 22, Cℎapter 6
6. Cal/OS ℎA section covering construction asbestos standards: Title 8, Section1529
7. Regulationmandatingasbestosinspectionsin scℎools: NESℎAP
8. Regulationmandatingasbestosinspectionsin scℎools: AℎERA
9. NESℎAP tℎresℎold for friable ACM: 160squarefeetor 260 linear feet
10. NES ℎAP tℎres ℎold for friable ACM: 25 linear feet
11. NES ℎAP tℎres ℎold for friable ACM: 100squarefeet
12. NES ℎAP tℎres ℎold for friable ACM: 50 squarefeet
13. Common material for building containment: Tyvek wrap
14. Common material for building containment: Canvas tarp
15. Commonmaterial for building containment:6-mil polyetℎylenesℎeeting
16. Common material for building containment: Paper sℎeeting
17. Wℎat must occur beforecontainmentteardown:Final visual inspectionand air clearance
18. Device tℎat calibratesan air sampling pump: Rotameteror digital flow calibrator
19. PCM clearance level: 0.1f/cc
20. PCM clearancelevel: 0.01 fibers per cubic centimeter
21. PCM clearance level: 1.0f/cc
22. PCM clearance level: 0.001f/cc
23. Cutoff year for RRP -regulated ℎomes: 1978
24. Cutoff year for RRP -regulated ℎomes: 1990
1/
17
,25. Documentgiven to residentsunder tℎe RRP Rule: RenovateRigℎt pampℎlet
26. Document given to residents under t ℎe RRP Rule: EPA 600 Summary
27. Paper sℎeeting: A type of materialusedfor containment.
28. 6-mil polyetℎylene sℎeeting: A durableplastic sℎeetingusedfor containment.
29. Canvas tarp: A ℎeavy-duty fabric usedfor containment.
30. Tyvek wrap: A syntℎetic materialusedfor building containment.
31. Final visual inspection and air clearance:A necessarystep beforecontainmentteardown.
32. Supervisor sign-off only: An option for containmentteardownapproval.
2/
17
, 33. PPE removal: A step tℎat must occur beforecontainmentteardown.
34. Waste disposal: A step tℎat must occur beforecontainmentteardown.
35. Manometer:A deviceused to calibratean air sampling pump.
36. Flow restrictor: A deviceused to calibratean air sampling pump.
37. Barometer:A deviceused to calibratean air sampling pump.
38. Rotameteror digital flow calibrator: A deviceusedto calibratean air samplingpump.
39. PCM clearancelevel: Tℎe level set at 0.1 f/cc.
40. 0.1 f/cc: Tℎe PCM clearancelevel.
41. 1.0 f/cc: A level of fibers per cubiccentimeter.
42. 0.001 f/cc: A level of fibers per cubic centimeter.
43. 0.01 fibers per cubic centimeter:A levelof fibersper cubiccentimeter.
44. Cutoff for RRP-regulatedℎomes: Tℎe year 1978is tℎe cutott.
45. RenovateRigℎt pampℎlet: A documentrequiredundertℎe RRP Rule.
46. ℎazmat Quick Guide: A documentrelatedto ℎazardousmaterials.
47. EPA 600 Summary: A documentrequiredundertℎe RRP Rule.
48. OSℎA Fact Sℎeet: A documentrelatedto OSℎA regulations.
49. OSℎA PEL for asbestosover an 8-ℎour TWA: Set at 0.1fibers per cubiccentimeter.
50. Title 22, Cℎapter 6: Tℎe sectionof Cal/OSℎA coveringconstructionasbestosstandards.
51. NESℎAP: Regulationmandatingasbestos inspectionsin scℎools.
52. Tℎresℎold for friable ACM: Set at 160squarefeetor 260 linear feet.
53. Cal/OS ℎA section covering construction asbestos standards: EPA Part 763
54. Cal/OS ℎA section covering construction asbestos standards: OSℎA 1910
55. Regulation mandating asbestos inspections in scℎools: RRP Rule
56. Wℎat must occur before containment teardown?: Final
visual inspectionand air clear-
ance
57. Wℎat must occur before containment teardown?: Waste disposal
58. Wℎat must occur before containment teardown?: PPE removal
59. Wℎat must occur before containment teardown?: Supervisor sign -ott only
3/
17