off switch at the entry door for all negativeair units, and fire retardant
poly?
a. SCAQMD Rule 1403
b. EPA-AHERA
c. Cal-OSHA T8,1529
d. None of the above:d. Noneof theabove
2. Which regulationnamesfive removalprocedures?
a. LA Fire DepartmentDivision 10
b. EPA-ASHARA
c. SCAQMD Rule 1403
d. 29 CFR 1926.1101:d. 29 CFR 1926.1101
3. Which regulationhas several appendiẋ sections,one of which consistsof
non-mandatory work practices?
a. Cal-OSHA T8, CCR 1529
b. EPA-ASHARA
c. NESHAP
d. SCAQMD Rule 1403: a. Cal-OSHA T8, CCR 1529
4. From which agency did the term asbestos -containing construction material
(ACCM) come from?
a. NESHAP
b. US EPA
c. 29 CFR 1926.1101
,d. Cal-OSHA: d. Cal-OSHA
5. What is the definitionof asbestos-containingconstructionmaterial(ACCM)?
a. > 1% and less than 2%
b. 1% or more
c. > 0.1%
d. None of the above: c. > 0.1%
6. From whichregulationdoesthetermRACM(RegulatedAsbestosContaining
Material) come from?
a. 29 CFR 1926,1101
b. 40 CFR Part 763, Subpart E
, c. 40 CFR Part 61, Subpart M
d. T8, CCR 1529: c. 40 CFR Part 61, SubpartM
7. What is the definitionof asbestoswastein California?
a. > 0.1%
b. 1% or more
c. > 1%
d. None of the above: b. 1% or more
8. Class I work consists of working with
a. Transite and TSI
b. TSI and Floor Tiles
c. floor Tile and Roofing
d. TSI and Surfacing Material:d. TSI andSurfacingMaterial
9. When can AHERA trained supervisor/competent person employed by a state
licensed asbestos removal contractor collect up to 12 bulk samples according
to Stateof California regulations?
a. At any time on an asbestosremovalproject
b. On a residential project after they have taken a building inspector course
c. Only on a State of California CAC or CSST may collect samples
d. On a project less than 1,000 sq ft: b. On a residentialprojectafter theyhavetakena building
inspector course
10. Whichagencydescribesasbestoswork as Class I, II III and IV?
a. SCAQMD (Rule 1403)
b. NESHAP
c. Cal-OSHA
d. AHERA: c. Cal-OSHA
11. Class II work consists of working with
a. Surfacing materials