"THE TYPICAL PROJECT" MODULE 7
2026/2027 ACTUAL QUESTIONS WITH
VERIFIED ANSWERS.
Notify Those affected
Pre-con meeting
Inspection before delivery of devices
Pre-construction activities
Pre-Con
Meeting between project owner and all other interested parties
to review: (contractors, inspectors, engineers, EMS, Utilities)
contract requirements
construction details
work schedules
all other items
What was observed (devices and position, weather, traffic
flow, flagging opperations, incidents)
needed corrections and if corrected, when?
What to doccument
Traffic Impact Analysis
Used to predict travel caused by large land developments, &
determine mitigation, Performed during the project's early
planning stages. Estimates the traffic generated by new
development. Determines whether the proposed development
adversely impacts the existing transportation network. Identifies
traffic access problems on existing roadways Outlines options
, to address any identified problems. May propose infrastructure
improvements to address problems
imminent danger
Any condition where a high probability exists that an accident
may occur that will result in death or serious physical harm.
lateral deflection of barrier rail
Need to be pinned down or allow for a minimum of 2' deflection
AASHTO
American Association of State Highway and Transportation
Officials
ITE
Institute of Transportation Engineers
what does bold text mean in the MUTCD
shall
when was the MUTCD published
2009
Do specials contract provisions govern over the MUTCD?
yes
ADVANCE WARNING AREA
TRANSITION AREA
LONGITUDINAL BUFFER SPACE
ACTIVITY AREA
TERMINATION AREA
DETERMINE A TAPER
Length x Width x Speed