QUESTIONS AND CORRECT Answers
Which step must be run immediately before a Confirm Load
step?
Import
Certify
Process
Load
When adding rows to the Workflow Hierarchy Builder Begin Profiles
template, we know they must be added below Row 5 and End Profiles
before Row 9 between two tags in the initial template.
What are these two tags?
Initial Objects
Final Objects
Begin Profiles
End Profiles
Which groups are listed under the Application tab? Cube, Workflow, and Data Collection
Select two answers. Presentation and Tools
Administration and Logging
Tools, Dashboards, and Documents
Cube, Workflow, and Data Collection
Presentation and Tools
,Which phases are included in a typical OneStream Analyze, Design, Build, Test, and Rollout
Project?
Analyze, Design, Build, Test, and Rollout
Build, Test, and Rollout
Analyze, Design, and Rollout
Which task is a key component of the Test Phase? Training the Team on User Acceptance Training
Prototyping
Training the Team on User Acceptance Training
Finalizing the structure of Dimensions
Where do you apply/edit the Currency filters? Application | Tools | Application Properties
Application | Tools | Application Properties
Application | Cube | FX Rates
Application | Cube | Spreadsheet
What is the goal of a Requirements Gathering Workshop? Establish an understanding of what the system is expected to do when it is live.
Start the design of the metadata structure in OneStream.
Establish an understanding of what the system is
expected to do when it is live.
Determine how the client wants to set up their Workflow.
What is the foundation on which all application artifacts Metadata
are built?
Metadata
Dashboards
Rules
Mapping Rules
What should a good rollout strategy ensure? It ensures that the end users feel comfortable and confident with the OneStream
It ensures that the end users have the opportunity to Application and new processes.
provide feedback on the design of the OneStream
Application and new processes.
It ensures that the end users like and get along with the
OneStream Application and new processes.
It ensures that the end users feel comfortable and
confident with the OneStream Application and new
processes.
An Architect Lead needs to create a Time Dimension Custom Time Dimension Type
based on a 13-period fiscal calendar. Which Time
Dimension Type needs to be used?
Standard Time Dimension Type
Custom Time Dimension Type
StandardUsingBinaryData Time Dimension Type
What do the descriptions |fyfy| or |cycy| display when They display the year as a four-digit number in Time Periods
used in a Time Period Description?
They display the year as a four-digit number in Time
Periods
They display the year as a two-digit number in Time
Periods
They display the full month in a Time Period description
, How many Time Dimension Profiles are allowed per 1
cube?
1
2
3
4
Which Categories can be found in the Member Security and General
Properties tab for all visible Dimension Types in the Descriptions
Dimension Library?
Security and General
Workflow and Aggregation
Descriptions
Custom Settings and Vary by Cube Type
Which Dimensions are customizable and can be found in Entity, Scenario, Account, Flow, UD1-UD8
the Dimension Library?
Entity, Scenario, Account, Flow, UD1-UD8
Scenario, Time, Account, Flow, UD1-UD8
Entity, Time, IC, Scenario, Account, View, UD1-UD8
An architect wants to load an XML file created through Application Tab | Tools | Load/Extract
the Excel Metadata Builder. Where in the application
would the architect load this XML file?
System Tab | Tools | Load/Extract
Application Tab | Tools | Load/Extract
Application Tab | Tools | Spreadsheet
Where can the Excel Metadata Builder be downloaded? OneStream MarketPlace
In OneStream under System | Documents | Public
By clicking on the question mark icon in OneStream.
OneStream MarketPlace
What will happen if a Time Dimension is not specified? The default Standard Time Dimension Definition will be used
The M12_3333_W52_445 Time Dimension Definition will be
used
A Custom Time Dimension Definition will be used
The default Standard Time Dimension Definition will be
used
What allows everything to be contained in one Extensibility
application?
Intercompany Process in OneStream
Analytic Blend
Extensibility