1. The only way a Certified Renovator, he/she can test if a component he/she
is disturbing is above the Federal Level for lead-based paint.
- Correct Answer: EPA recognized Test kit
2. The 3 ways a certified lead-based paint inspector or risk assessor can
determine whether paint is LBP. - Correct Answer: Paint Chip Sampling
Laboratory Sampling
XRF
3. Certified Renovators must submit all copies of the test results from the EPA
recognized test kits to the client as soon as possible, but no later than
______ days after completing the renovation.
- Correct Answer: 30 days
4. The Certified Renovator/Certified Firm must offer or give the Renovate
Right pamphlet to before work begins.
- Correct Answer: Legal parent/Guardian
Homeowner
Business Owner
,5. On interior work being performed the Certified Renovator must put plastic
out this distance from the activity. - Correct Answer: 6 feet in all
directions
6. On exterior work being performed the Certified Renovator must put plastic
out this distance from the activity. - Correct Answer: 10 Feet in all
directions
7. Prohibited behaviors in the work area. - Correct Answer: Eating
Drinking
Smoking
8. To fully contain the work area during interior work the Certified Renovator
shall use plastic sheeting to close and seal all of these three items. -
Correct Answer: Windows
Doors
Vents
9. The Certified Renovator shall post caution signs this distance from the edge
of the work area on exterior work. - Correct Answer: 20 Feet
10.If an item is within 6 feet of the work area the Certified Renovator shall be.
- Correct Answer: Sealed or removed
,11.When doing exterior work, doors & windows must be kept closed when
closer than this distance from the renovation work. - Correct Answer:
20 feet
12.When cleaning a work area, the contractor shall start at this location;
__________________ and end at this location. - Correct Answer:
Furthest point from the door
At the door
13.The last item that should be cleaned in a work area . - Correct Answer:
Floor
14.The three RRP prohibited activities.
- Correct Answer: No Power Tools
No Heat guns in excess of 1100 F
No open flame torching/Burning
15.High Efficiency Particulate Air - Correct Answer: HEPA
16.The "HEPA" vacuum has a filter attachment that filters particulates of 0.3
microns or greater to this efficiency. - Correct Answer: 99.97%
17.You should never operate a heat gun in excess of _______ degrees
Fahrenheit (F).
- Correct Answer: 1,000 Degrees Farenheit
, 18.The type of vacuum that is required during cleanup activities. - Correct
Answer: HEPA
19.The OSHA Permissible Exposure Limit (PEL) for lead. - Correct Answer:
50 ug/m3 in an hour period
20.4 required PPE for LSW. - Correct Answer: Painters Hat
P,N,R 100 respirator
Coveralls
Shoe covers
21.Required hygiene when leaving the containment area. - Correct Answer:
Wash hands and face
22.When cleaning the interior you must clean this distance beyond the
contained work area.
- Correct Answer: 2 Feet
23.A cleaning verification (CV) is passed. - Correct Answer: Matches or
Lighter than the CV card
24.The amount of time a certified renovator must wait if the second wet cloth
fails for the CV and then wipe the surfaces with an electro-statically charged
white disposable cleaning cloth.
- Correct Answer: 1 hour