QUESTIONS AND CORRECT ANSWERS|GRADED A+ |
VERIFIED ANSWERS|
You have a request to purchase 1,500 commercially available sheds, one
for each family housing unit. Each shed will cost $1,500 (total of $2.25
million). Correct Answers ? Choose from the remaining answers below:
-Simplified acquisition procedures can be used ONLY if the contracting
officer requests a request for proposals (RFP).
-Simplified acquisition procedures can be used.
What is the preferred method of solicitation for requirements over
$25,000? Correct Answers ? I answered Written and it was wrong.
You have a requirement to buy janitorial services for your facility. There
has been a history of performance and customer service problems with
the present and past contractors. Your evaluation criteria for the follow-
on solicitation should contain a factor for: Correct Answers Past
performance
The public works department at your Federal facility needs to buy repair
parts for a water fountain in the building. The parts will cost about $100
and can be bought at Nuts-n-Bolts Hardware. Which method of
purchase is preferred? Correct Answers The Governmentwide
commercial purchase card
A contract option may be exercised: Correct Answers ? This answer is
wrong
, Only if the contractor agrees.
In acquisitions for commercial items, the terms of an express warranty
should be: Correct Answers Consistent with customary commercial
practice
Which of the following are acceptable market research techniques?
Correct Answers All techniques listed are acceptable.
Which method of purchase is the most appropriate for requirements
exceeding the the micro-purchase threshold? Correct Answers Purchase
Order
A commercial item is a supply or service that: Correct Answers -
Requires extensive modifications unique to the Government.
-Is a previously developed item used exclusively for governmental
purposes.
-Is sold or offered for sale to the general public.*
-Is not available to the general public.
The required sources of supplies and services can be found in: Correct
Answers FAR Part 8
A synopsis in the GPE is generally required for: Correct Answers
Proposed contract actions exceeding $25,000