,Chapter 1: The World of Project Management
b b b b b b
True/False
1. A primary purpose of forming projects is to assign the responsibility for
b b b b b b b b b b b
accomplishing some organizational task to a specific person or small group.
b b b b b b b b b b b
Answer: True b
Response: See section 1.1 Level: b b b b
easy
2. One of the few similarities between project management and general
b b b b b b b b b
management isthat both exist inthe well-defined organizational structure of
b b b b b b b b b b b
superior/subordinates in the overall organization.
b b b b b
Answer: False b
Response: See section 1.2 Level: b b b b
medium
3. Many recent developments in project management are being driven by changes in the
b b b b b b b b b b b b
natureofthe American workforce.
b b b b b
Answer: False b
Response: See section 1.1 Level: b b b b
medium
4. There has been a growing use of projects to achieve an organization’s strategic
b b b b b b b b b b b b
goals
b
Answer: True b
Response: See section 1.1 Level: medium b b b b b
IF YOU WANT THIS DOCUMENT EMAIL ME AT,
b b b b b b b
TO GET THE FULL DOCUMENT IN PDF FORMAT.
b b b b b b b
Copyright ©2017 John Wiley & Sons, Inc. b b b b b b
, IF YOU WANT THIS DOCUMENT EMAIL ME AT,
b b b b b b b
TO GET THE FULL DOCUMENT IN PDF FORMAT.
b b b b b b b
Copyright ©2017 John Wiley & Sons, Inc.
b b b b b b
, 5. While general managers have their authority limited to specific areas in the overall
b b b b b b b b b b b b
organization, project managers have authority over anyactivityrequired by the
b b b b b b b b b b b
project.
b
Answer: False b
Response: See section 1.2 b b b
Level: medium
b b
6. Projects are always carried out under conditions of uncertainty.
b b b b b b b b
Answer: True b
Response: See section 1.3 b b b
Level: easy
b b
7. One can trade-off time and cost when managing a project, but the project’s
b b b b b b b b b b b b
technical specifications must be maintained exactly as the client initially specifies.
b b b b b b b b b b
Answer: False b
Response: See section 1.3 b b b
Level: medium
b b
8. Nonnumeric project selection methods are only suitable if numeric methods are not
b b b b b b b b b b b
available.
b
Answer: False b
Response: See section 1.5 b b b
Level: medium
b b
9. When using financial methods for selecting projects, the payback period is the
b b b b b b b b b b b
simplest and best method to use.
b b b b b b
Answer: False b
Response: See section 1.5 b b b
Level: medium
b b
10 Rank-ordering a large number of projects can be done with a Q-sort.
b b b b b b b b b b b
Copyright ©2017 John Wiley & Sons, Inc.
b b b b b b