NEIEP 200 test | Actual Questions and Answers |
2026 Update | 100% Correct.
While performing an elevator, you need to check the hoist ropes for adequate lubrication.
Where should you check to determineif the ropes need lubricating?
Check the grooves of the drive sheave
You are preparing to hoist a T rail for installation. What must you consider when
staggering the rails?
Tongue and groove orientation.
You will be installing a high-rise traction elevator that uses compensating ropes. What is
the best method for installing the ropes?
Attach the ropes to the bottom of the car and run the car to the top of the hoist way to unreel the
ropes.
You have completed re-roping an elevator. Approximately how long should you wait to
recheck the tensioning?
One month
You are installing a compensating sheave frame and need to determine where it should be
positioned relative to the rails. Where should you look to find this information?
Final layout drawing
After mounting a governor tension sheave to a pit floor, why is it important to run the car
down on the fully compressed buffers?
, To confirm proper alignment to the releasing carrier.
You are locating the point of a rope drop from the driveshaft to the car hitch plate. Which
tool should you use?
Plum bob
The crane operator is awaiting your signals to hoist the load 20 feet. Which of the following
are the correct Audible signals to hoist the load 20 feet?
Hoist up, 20 feet, load stop
You have installed a gear machine that is not inside of the main line disconnect. What does
NEC require to ensure the safety of personnel working on this equipment?
A manually operated switch adjacent to the machine.
You are installing a corner post freight ELEVATOR. The layout, drawing calls for the rail
brackets to be installed where the guide shoes would be located when the car is floor level.
Why should the brackets be located in this position?
To provide stability during loading and unloading.
You are inspecting the hoistway guard rail systems. At minimum OSHA requires that
standard guardrails withstand a force of how many pounds in the direction of the
hoistway?
200 pounds
You must store T-rails outside of the pit prior to installation. How should they be
positioned?
2026 Update | 100% Correct.
While performing an elevator, you need to check the hoist ropes for adequate lubrication.
Where should you check to determineif the ropes need lubricating?
Check the grooves of the drive sheave
You are preparing to hoist a T rail for installation. What must you consider when
staggering the rails?
Tongue and groove orientation.
You will be installing a high-rise traction elevator that uses compensating ropes. What is
the best method for installing the ropes?
Attach the ropes to the bottom of the car and run the car to the top of the hoist way to unreel the
ropes.
You have completed re-roping an elevator. Approximately how long should you wait to
recheck the tensioning?
One month
You are installing a compensating sheave frame and need to determine where it should be
positioned relative to the rails. Where should you look to find this information?
Final layout drawing
After mounting a governor tension sheave to a pit floor, why is it important to run the car
down on the fully compressed buffers?
, To confirm proper alignment to the releasing carrier.
You are locating the point of a rope drop from the driveshaft to the car hitch plate. Which
tool should you use?
Plum bob
The crane operator is awaiting your signals to hoist the load 20 feet. Which of the following
are the correct Audible signals to hoist the load 20 feet?
Hoist up, 20 feet, load stop
You have installed a gear machine that is not inside of the main line disconnect. What does
NEC require to ensure the safety of personnel working on this equipment?
A manually operated switch adjacent to the machine.
You are installing a corner post freight ELEVATOR. The layout, drawing calls for the rail
brackets to be installed where the guide shoes would be located when the car is floor level.
Why should the brackets be located in this position?
To provide stability during loading and unloading.
You are inspecting the hoistway guard rail systems. At minimum OSHA requires that
standard guardrails withstand a force of how many pounds in the direction of the
hoistway?
200 pounds
You must store T-rails outside of the pit prior to installation. How should they be
positioned?