When it comes to trenches, what is the specific rule for the distance between ladders and
workers? - correct-answer -A worker must always be within 25' of a ladder while working inside
a trench. If a trench is 50' long, only one ladder is required, if it's placed in the center of the
trench.
While installing a run of pipe, which way is the bell end of the pipe facing? - correct-answer -
The bell end of the pipe faces forward, in the direction that work is progressing.
What are the separation requirements when laying a water main around a sewer line? -
correct-answer -At least 10' of horizontal separation, with at least 1' of vertical separation (with
water mains always on top).
Water main - correct-answer -Any pipeline, except for user service line, within the water
distribution system.
What are the requirements for Main tapping for Services? - correct-answer -45 degrees from
top.
,2|Page
What is the minimum main size for a Residential area? - correct-answer -6"
What is the minimum main size for a Business area? - correct-answer -8"
What is a 4" main primarily used for? - correct-answer -Circulation.
Where is the valve located on a Dry Barrel fire hydrant? - correct-answer -The valve is located in
the ground, under the hydrant.
Where is the valve located on a Wet Barrel fire hydrant? - correct-answer -There is no main
valve. Each nozzle has a separate valve.
What is the typical spacing range(s) between fire hydrants? - correct-answer -Ranges from 300'
to 600'.
What is "Thrust"? - correct-answer -Pressure exerted at bends and turns in mains.
What are Thrust Blocks? - correct-answer -Support structures (usually poured concrete) which
support joints in areas of high thrust to reduce chance of pipe separation.
, 3|Page
What is "Haunching"? - correct-answer -Compacting soil back into a previous excavation.
What are the rules for the two compaction levels for backfilling? - correct-answer -1st level:
Should be placed on both sides of the pipe and up to about the center of the pipe.
2nd level: Should be placed 6" over the pipe.
What are the steps for bringing a new main into service, after installation? - correct-answer -1.
Fill
2. Pressure/Leak test (1 1/2 times operation pressure, or 150 psi, whichever is greater, for 30
minutes)
3. Disinfect (25 to 50 ppm for 24 hours)
4. Flush
5. Sample for bacteria
What are the five areas of a Traffic Control Zone? - correct-answer -1. Advance Warning
2. Transition
3. Buffer
4. Work Area
5. Termination Area
What's the purpose of the Advance Warning area of a TCZ? - correct-answer -Lets people know
work is coming up. Distance before work area depends on speed of traffic.