●● Which is not typically used as an asphalt binder in fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA). Answer: PG 62-22
●● Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician
None of the above. Answer: The contractor
●● A full lot is composed of 5 sublots and 4 cores per lot T/F. Answer:
False
●● What is the most important for consistent compaction of asphalt
mix?
, The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction. Answer: The mix is
uniform in temperature
●● Referring to general stationing guidelines, R1 would be ____ than
R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C. Answer: Both A and C
●● While using the rolling straightedge, if the needle goes in the red
zone indicating an unacceptable high spot in the section, you then.
Answer: Mark the pavement where the needle first goes into the red
zone and place another mark where the needle leaves the red zone and
continue
●● For bridge approach slabs, the 15 foot manual straightedge should be
set so ____ is on the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge