Questions and Answers | 100%
Pass
OS&Y - ANSWER ✔✔Outside Stem & Yoke.
Shall be locked by chain in the open position.
When is a CSFSM needed? - ANSWER ✔✔When the building is
more than 250', more than 20 storis, or covers more than 200,000 sf.
Air Horn Signaling Duration - ANSWER ✔✔3 second horn blast with
a 10 second pause in between.
*A long continuous horn blast mans all clear.
,Muster Point - ANSWER ✔✔Site location all workers shall go to in
case of emergency.
CDA - ANSWER ✔✔Construction Demolition & Abatement. This unit
conducts permit inspections for the storing, handling, and use of
hazardous materials.
How far from the main entrance should the fire hydrant be? -
ANSWER ✔✔50'
Standpipe shall contain air pressurized alarm system at what height? -
ANSWER ✔✔75'
Red, yellow, and green cap colors represent what? - ANSWER
✔✔Red = standpipe
Yellow = standpipe and sprinkler
Green = sprinkler
A dry standpipe cannot exceed how many psig? - ANSWER ✔✔25
If a standpipe system is not returned toa state of readiness and the
alarm is not reactivated within two hours of planned removal service,
what plan of action must be taken? - ANSWER ✔✔All work must
cease on site.
, When should the Borough Dispatcher be notified? - ANSWER
✔✔When suppression is needed.
Minimum extinguisher rating throughout site. - ANSWER ✔✔2:A
20BC
Distance to fire extinguisher must be __________. - ANSWER
✔✔75', or 1 extinguisher for ever 1,500 sf.
PASS - ANSWER ✔✔Pull
Aim
Squeeze
Sweep
Contractor Sheds - ANSWER ✔✔Must be within 30' of new
construction/existing buildings
Heaters in Contractor Sheds - ANSWER ✔✔1. Electric heaters are
not permitted on the floor or walls.
2. Oil-filled heaters are permitted on the floor.
3. Disconnect shall be labeled for emergency services.
4. ABC horizontal mounted extinguisher system or tank shall be located
in each shed.
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.