Terms in this set (128)
Masterformat provides a standard -NOT- 51
structure for organizing construction
standards. How many primary
divisions are part of the
Masterformat?
Task orders are used for which of the Non-complex construction and maintenance and
below kinds of work? repair
The Master Planner wants to award a Yes
contract to support the installation's
master planning efforts. Based on
FAR Part 36.601-4(a), would this effort
be accomplished through an
architect-engineer contract?
,The Installation Commander is asking -NOT- Land Use Plan
questions about military construction,
operations and maintenance, and
military family housing projects
planned for the installation. Which
component of the Comprehensive
Plan would you go to a detail of the
physical location of projects that
have been approved or programmed
for funding throughout the
installation?
As the Design Manager preparing -NOT- Profit should consider the nature of the work
the government estimate for a design to be performed
project. When considering profit,
which if the following in NOT true?
FAR Part 22.406-7 - Compliance Agency's policy
Checking requires interviews of
laborers to check work classification,
rates of pay, fringe benefits payment,
and hours worked. How often is the
Government required to conduct
these interviews?
All project planning projects include Develop requirements; evaluate assets; analysis,
the same five steps. Which of the concepts, and proposals; initiate action; feedback
following shows the five steps in their and quality assurance
logical progression?
Which of the following may be An adjustment in price or delivery schedule in the
required if Government Furnished contract
Equipment (GFE) is not supplied to
the contractor in accordance with
the time specified in the contract?
, The Base Operations Support Sustainment
contractor in performing
preventative maintenance on the
HVAC in the headquarters building.
At the same time, they are responding
to a service call to repair one of the
toilets in the building. This work
would be defined as:
You are the installation -NOT- A report that states the extent of lead-based
Environmental Division Chief. There paint contamination and plans for decontamination
are residential structures on the must be submitted
installation where lead-based paint
has been used that have been
identified for disposal. Which of the
following environmental
requirements best describes the
procedure(s) that should be
followed?
Which of the following is NOT a -NOT- Public sale
potential action for disposal of
surplus property?
As the Project Manager, why might Increased potential for misinterpretations and
you NOT prefer to use a design-bid- possible litigation
build methodology for procuring the &
design and construction of your Lack of input from contractors and subcontractors
project? in the design process
Which of the following is not benefit Decreased worker productivity
of the Work Management System?
Cycle Support | Exam 2026/2027 update |
questions and verified answers
Save
Terms in this set (128)
Masterformat provides a standard -NOT- 51
structure for organizing construction
standards. How many primary
divisions are part of the
Masterformat?
Task orders are used for which of the Non-complex construction and maintenance and
below kinds of work? repair
The Master Planner wants to award a Yes
contract to support the installation's
master planning efforts. Based on
FAR Part 36.601-4(a), would this effort
be accomplished through an
architect-engineer contract?
,The Installation Commander is asking -NOT- Land Use Plan
questions about military construction,
operations and maintenance, and
military family housing projects
planned for the installation. Which
component of the Comprehensive
Plan would you go to a detail of the
physical location of projects that
have been approved or programmed
for funding throughout the
installation?
As the Design Manager preparing -NOT- Profit should consider the nature of the work
the government estimate for a design to be performed
project. When considering profit,
which if the following in NOT true?
FAR Part 22.406-7 - Compliance Agency's policy
Checking requires interviews of
laborers to check work classification,
rates of pay, fringe benefits payment,
and hours worked. How often is the
Government required to conduct
these interviews?
All project planning projects include Develop requirements; evaluate assets; analysis,
the same five steps. Which of the concepts, and proposals; initiate action; feedback
following shows the five steps in their and quality assurance
logical progression?
Which of the following may be An adjustment in price or delivery schedule in the
required if Government Furnished contract
Equipment (GFE) is not supplied to
the contractor in accordance with
the time specified in the contract?
, The Base Operations Support Sustainment
contractor in performing
preventative maintenance on the
HVAC in the headquarters building.
At the same time, they are responding
to a service call to repair one of the
toilets in the building. This work
would be defined as:
You are the installation -NOT- A report that states the extent of lead-based
Environmental Division Chief. There paint contamination and plans for decontamination
are residential structures on the must be submitted
installation where lead-based paint
has been used that have been
identified for disposal. Which of the
following environmental
requirements best describes the
procedure(s) that should be
followed?
Which of the following is NOT a -NOT- Public sale
potential action for disposal of
surplus property?
As the Project Manager, why might Increased potential for misinterpretations and
you NOT prefer to use a design-bid- possible litigation
build methodology for procuring the &
design and construction of your Lack of input from contractors and subcontractors
project? in the design process
Which of the following is not benefit Decreased worker productivity
of the Work Management System?