Question 1:
A highway construction project involving PCC pavement must follow which
document for quality assurance requirements?
A. Contractor handbook
B. Department QA publication
C. OSHA manual
D. Manufacturer specs
Correct Answer: B. Department QA publication
Rationale: The department’s QA publication is the official governing document for
PCC pavement quality assurance. It defines inspection, testing, and acceptance
requirements, while other documents are only supportive.
Question 2:
Who is responsible for quality control of PCC pavement?
A. DOTD inspector
B. District lab engineer
C. Project owner
D. Contractor
Correct Answer: D. Contractor
Rationale: The contractor is responsible for ensuring materials, equipment, and
workmanship meet specifications. DOTD personnel only verify compliance.
Question 3:
PCC production must conform to which specification sections?
,2026/2027
A. 101 & 201
B. 301 & 401
C. 601 & 901
D. 701 & 801
Correct Answer: C. 601 & 901
Rationale: These sections govern PCC materials, production, and construction
requirements.
Question 4:
Which method uses mobile side forms?
A. Conventional
B. Slip form
C. Stationary form
D. Manual paving
Correct Answer: B. Slip form
Rationale: Slip form paving uses moving forms attached to the machine for
continuous paving.
Question 5:
Which method uses stationary forms?
A. Slip form
B. Conventional
C. Automated
D. Continuous
Correct Answer: B. Conventional
Rationale: Conventional paving requires fixed forms set before placement.
Question 6:
Who performs slump, air, and temperature tests on site?
A. Project engineer
B. Authorized Concrete Field Tester
C. Surveyor
D. Truck driver
Correct Answer: B. Authorized Concrete Field Tester
, 2026/2027
Rationale: This certified personnel conducts QC tests on fresh concrete.
Question 7:
Purpose of Sampling Plan?
A. Payroll schedule
B. Material testing frequency
C. Cost estimate
D. Traffic control
Correct Answer: B. Material testing frequency
Rationale: It defines minimum sampling and testing requirements.
Question 8:
Why is pre-paving inspection done?
A. Cost check
B. Compare plans to field conditions
C. Hire workers
D. Inspect finances
Correct Answer: B. Compare plans to field conditions
Rationale: Ensures equipment and site match project requirements.
Question 9:
Discrepancies during inspection are reported to?
A. Foreman
B. Supplier
C. Project Engineer
D. Driver
Correct Answer: C. Project Engineer
Rationale: Project Engineer manages project corrections.
Question 10:
Sampling frequency is found in?