Concrete Safety Manager (CSM) Exam –
2026 Practice Test: 200 Questions with
Correct Answers & Rationales | PDF.
Q1. According to NYC Building Code (BC 2022, as amended
2026), a Concrete Safety Manager (CSM) is required for:
A) Any concrete pour exceeding 50 cubic yards
B) Any concrete operation during superstructure erection
C) Any project requiring a Site Safety Manager
D) All concrete work in Occupancy Category III buildings
Answer: B
Rationale: NYC BC §3310.4 requires a CSM whenever concrete
placement occurs during superstructure erection (columns, beams,
slabs, walls) for buildings >15 stories or with high-risk conditions.
Other triggers include specific DOB directives .
,Page 2 of 111
Q2. The CSM must be present on site during concrete
placement operations:
A) Only at the start of the pour
B) Continuously from arrival of first concrete truck until finishing is
complete
C) At least 50% of the pour duration
D) Only during pump setup
Answer: B
Rationale: NYC DOB CSM directive 2024-001 requires full-time
presence during active concrete operations, including pump
setup, pouring, vibrating, and finishing. The CSM cannot leave
the site while concrete is being placed .
,Page 3 of 111
Q3. Maximum fine for a CSM failing to maintain required
daily log for a concrete pour in NYC:
A) 5,000B)5,000B)10,000
C) 25,000D)25,000D)50,000
Answer: C
Rationale: Per NYC Administrative Code §28-204.5, failure to
maintain required concrete placement records can result in a civil
penalty of up to $25,000 per violation. Recordkeeping is a
critical CSM responsibility .
Q4. A CSM's certification is valid for how many years in
NYC?
A) 2 years
B) 3 years
, Page 4 of 111
C) 5 years
D) Indefinite
Answer: B
Rationale: NYC DOB requires recertification every 3 years with
proof of continuing education (14 hours minimum, including 2
hours of code updates). The 8-Hour Concrete Safety Manager
Refresher course is one component of maintaining certification .
Q5. Which of the following is NOT a required element of the
CSM's Pre-Pour Safety Checklist?
A) Formwork inspection by a qualified person
B) Concrete truck driver's license verification
C) Rebar placement and cover check
D) Emergency response plan review with crew
Answer: B