A-B Operator Petro Tech Exam
Questions and Answers Latest
Version Top Rated
Question 1
Regulations require that you report any conditions indicating a suspected release to the DEQ within .
Correct Answer>>
24hrs
Question 2
When is an owner/operator no longer required to maintain financial responsibility for a UST?
Correct Answer>>
When the UST has been properly closed.
Question 3
Class A and Class B operators must be trained within days after assuming operation and maintenance duties at the UST
facility.
Correct Answer>>
30
Page 1 of 27
,Question 4
Class C operators must be trained before assuming responsibility for responding to emergencies at the UST facility.
Correct Answer>>
true
Question 5
Which of the following is a Stage I vapor recovery requirement for a facility with a monthly throughput of less than 10,000
gallons?
Correct Answer>>
All of these examples
Question 6
Owners/operators must maintain accurate and current records for every UST .
Correct Answer>>
not at the ust, not at alt site
Question 7
You must investigate and confirm all suspected releases within days of discovery.
Correct Answer>>
7
Page 2 of 27
, Question 8
In a pressurized pump system, where is the pump located?
Correct Answer>>
In the tank
Question 9
You can use groundwater monitoring only if the product stored in the tank .
Correct Answer>>
Does not mix easily with water and instead floats on the water's surface
Question 10
What does spill protection equipment do?
Correct Answer>>
not none of these
Question 11
How often should owners/operators provide their SIR vendor with inventory, delivery, and dispensing data?
Correct Answer>>
Every 30 days
Page 3 of 27
Questions and Answers Latest
Version Top Rated
Question 1
Regulations require that you report any conditions indicating a suspected release to the DEQ within .
Correct Answer>>
24hrs
Question 2
When is an owner/operator no longer required to maintain financial responsibility for a UST?
Correct Answer>>
When the UST has been properly closed.
Question 3
Class A and Class B operators must be trained within days after assuming operation and maintenance duties at the UST
facility.
Correct Answer>>
30
Page 1 of 27
,Question 4
Class C operators must be trained before assuming responsibility for responding to emergencies at the UST facility.
Correct Answer>>
true
Question 5
Which of the following is a Stage I vapor recovery requirement for a facility with a monthly throughput of less than 10,000
gallons?
Correct Answer>>
All of these examples
Question 6
Owners/operators must maintain accurate and current records for every UST .
Correct Answer>>
not at the ust, not at alt site
Question 7
You must investigate and confirm all suspected releases within days of discovery.
Correct Answer>>
7
Page 2 of 27
, Question 8
In a pressurized pump system, where is the pump located?
Correct Answer>>
In the tank
Question 9
You can use groundwater monitoring only if the product stored in the tank .
Correct Answer>>
Does not mix easily with water and instead floats on the water's surface
Question 10
What does spill protection equipment do?
Correct Answer>>
not none of these
Question 11
How often should owners/operators provide their SIR vendor with inventory, delivery, and dispensing data?
Correct Answer>>
Every 30 days
Page 3 of 27