1. What is the primary role of a project manager?
Answer: To lead the project team and ensure project objectives are achieved within scope,
time, cost, and quality constraints.
2. What is a project?
Answer: A temporary endeavor undertaken to create a unique product, service, or result.
3. What is project scope?
Answer: The work required to deliver a project's products, services, or results.
4. What document formally authorizes a project?
Answer: The Project Charter.
5. What is a stakeholder?
Answer: Any individual, group, or organization that can affect or be affected by the project.
6. What is the triple constraint?
Answer: Scope, Schedule, and Cost.
7. What is a Work Breakdown Structure (WBS)?
Answer: A hierarchical decomposition of project deliverables and work.
8. What is a milestone?
Answer: A significant point or event in a project.
9. What is project risk?
Answer: An uncertain event or condition that may impact project objectives.
10. What is a risk register?
Answer: A document used to record and track identified project risks.
11. What is a baseline?
, Answer: An approved version of a work product used for comparison.
12. What is project integration management?
Answer: Coordinating all project management processes and activities.
13. What is project initiation?
Answer: The process of formally starting a project.
14. What is project planning?
Answer: Defining project objectives and determining how to achieve them.
15. What is project execution?
Answer: Performing the work defined in the project management plan.
16. What is project monitoring and controlling?
Answer: Tracking, reviewing, and regulating project performance.
17. What is project closure?
Answer: Finalizing all project activities and formally ending the project.
18. What is a deliverable?
Answer: A measurable output produced during a project.
19. What is critical path?
Answer: The longest sequence of activities determining project duration.
20. What is float (slack)?
Answer: The amount of time an activity can be delayed without affecting project completion.
21. What is resource leveling?
Answer: Adjusting schedules to address resource constraints.
22. What is resource smoothing?