Ideally - and based on level of commitment required - which role should play the
lead role at the beginning of every six sigma project?
A. Green Belts
B. Black Belts
C. Master Black Belts
D. Champions
E. Executives
Give this one a try later!
D. Champions
Which is NOT a characteristic of a good six sigma project idea?
A. Supports strategic goals
B. Defect can be defined
, C. Solution is known
D. Benefits can clearly be identified
E. Executive supports exists
Give this one a try later!
C. Solution is known
Assuming a 1.5 sigma shift is included, how many defects per million opportunities is
represented by a six sigma level of quality?
A. .002
B. 1.2
C. 3.4
D. 6
E. 4.5
Give this one a try later!
C. 3.4
Variation among multiple measurements performed by the same operator to a single
piece and with the same measurement instrument is a measure of:
A. True Value
B. Reproducibility
C. Bias
D. Resolution
E. Repeatability
Give this one a try later!
lead role at the beginning of every six sigma project?
A. Green Belts
B. Black Belts
C. Master Black Belts
D. Champions
E. Executives
Give this one a try later!
D. Champions
Which is NOT a characteristic of a good six sigma project idea?
A. Supports strategic goals
B. Defect can be defined
, C. Solution is known
D. Benefits can clearly be identified
E. Executive supports exists
Give this one a try later!
C. Solution is known
Assuming a 1.5 sigma shift is included, how many defects per million opportunities is
represented by a six sigma level of quality?
A. .002
B. 1.2
C. 3.4
D. 6
E. 4.5
Give this one a try later!
C. 3.4
Variation among multiple measurements performed by the same operator to a single
piece and with the same measurement instrument is a measure of:
A. True Value
B. Reproducibility
C. Bias
D. Resolution
E. Repeatability
Give this one a try later!