UPDATED STUDY GUIDE
⩥ What is a fire bill?
Answer: A list of procedures you follow in case of a fire. They
should be posted throughout the station.
⩥ How is inerted ammunition that kept its original markings and
paint identified as inert?
Answer: It is marked with a serial number that is traceable to a
record of certification and identification
⩥ What type of deviation is an exemption?
Answer: A long-term deviation for operations that cannot meet
criteria at existing facilities
⩥ What is the maximum amount of time permitted for an
exemption to be in effect?
Answer: 5 years
, ⩥ What type of documentation is NOT required for explosives
safety site approval request (ESAR)?
Answer: Ship arrivals???
⩥ What two actions are required to support
Qualification/Certification training? Select all that apply.
Answer: Identify A&E personnel
Training all A&E personnel
⩥ When does a certification expire?
Answer: Last day of the 12th month
⩥ Which A&E personnel must be qualified/certified before
handling A&E?
Answer: All individuals (Navy and Civilian) who handle A&E
⩥ Where are Standard Operating Procedures (SOPs) required to
be located?
Answer: On-hand in work areas at all times (areas where
processing is performed)