LEED‐New Construction (NC)
Give this one a try later!
- v4 most uptodate
- launched in late 2013
- many LEED v3/2009 projects are under construction and still have not
been certified.
Regional Priorities Category
Give this one a try later!
, address regional environmental priorities for buildings in different
geographic regions
Which of the following is NOT a minimum program requirement (MPR)?
A. Compliance with project size requirements
B. Reasonable LEED boundaries
C. Commitment to sharing whole-building energy and water usage data
D. Permanent location on existing land
Give this one a try later!
C. Commitment to sharing whole-building energy and water usage data
Grammatically, what language is the appropriate usage to describe a project that has
been certified at any level?
A. LEED-certified
B. LEED certification
C. LEED Certified
D. LEED Certified certified
Give this one a try later!
Give this one a try later!
- v4 most uptodate
- launched in late 2013
- many LEED v3/2009 projects are under construction and still have not
been certified.
Regional Priorities Category
Give this one a try later!
, address regional environmental priorities for buildings in different
geographic regions
Which of the following is NOT a minimum program requirement (MPR)?
A. Compliance with project size requirements
B. Reasonable LEED boundaries
C. Commitment to sharing whole-building energy and water usage data
D. Permanent location on existing land
Give this one a try later!
C. Commitment to sharing whole-building energy and water usage data
Grammatically, what language is the appropriate usage to describe a project that has
been certified at any level?
A. LEED-certified
B. LEED certification
C. LEED Certified
D. LEED Certified certified
Give this one a try later!