Systems that are not required to be commissioned under EA prerequisite
Fundamental Commissioning and Verification include the (5) following:
Give this one a try later!
- building envelope
- life-safety systems
- communications and data systems
- fire protection and fire alarm systems
process equipment
In the MR category, the default material cost is ____% of the total construction cost for
a specific material and its installation
Give this one a try later!
, 45%
how many points are need for each LEED cert level?
Give this one a try later!
Cert: 40-49 points
Silver: 50-59 points
Gold: 60-79 points
Platinum: 80+ points
A site assessment conducted for SS credit Site Assessment should include information
on the following (7) factors:
Give this one a try later!
- topography
- hydrology
- climate
- vegetation
- soils
- human use
- human health effects
For EA credit Enhanced Refrigerant Management, the mechanical engineer chooses
the appropriate refrigerants based on performance and 2 values called _____________ and
_____________
Give this one a try later!
, ozone depletion potential (ODP); global warming potential (GWP)
Healthcare project teams pursuing EQ credit Construction Indoor Air Quality
Management Plan should implement a(n) ___________________ that is based on both
SMACNA guidelines and the 2010 FGI Guidelines
Give this one a try later!
environmental quality management plan (EQMP)
MR credit PBT Source Reduction: Mercury prohibits the use of _______________ due to the
high rate of breakage and risk of mercury exposure for staff and patients
Give this one a try later!
circular fluorescent lamps
The RP category contains a single credit that can earn a project up to _____ points for
meeting any ______ of the _____ credits specific to the project's locale.
Give this one a try later!
4; 4; 6
the ____________ was established to help project teams with multiple rating system
choices decide on a rating system and is based on the percentage of a project's gross
, floor area that is appropriate for a particular rating system
Give this one a try later!
40/60 rule
The intent of ___________________ is to encourage the team integration required by a LEED
project and to streamline the application and certification process.
Give this one a try later!
IN credit LEED Accredited Professional
To meet the requirements of MR prerequisite PBT Source Reduction:Mercury, project
teams must identify the following:
Give this one a try later!
- types of mercury containing products and devices to be collected
- how the mercury containing products and devices are to be handled by a
recycling program
- the disposal methods for captured mercury
The 5 categories for "diverse uses" includes the following:
Give this one a try later!
- food retail
- community-serving retail
- services
Fundamental Commissioning and Verification include the (5) following:
Give this one a try later!
- building envelope
- life-safety systems
- communications and data systems
- fire protection and fire alarm systems
process equipment
In the MR category, the default material cost is ____% of the total construction cost for
a specific material and its installation
Give this one a try later!
, 45%
how many points are need for each LEED cert level?
Give this one a try later!
Cert: 40-49 points
Silver: 50-59 points
Gold: 60-79 points
Platinum: 80+ points
A site assessment conducted for SS credit Site Assessment should include information
on the following (7) factors:
Give this one a try later!
- topography
- hydrology
- climate
- vegetation
- soils
- human use
- human health effects
For EA credit Enhanced Refrigerant Management, the mechanical engineer chooses
the appropriate refrigerants based on performance and 2 values called _____________ and
_____________
Give this one a try later!
, ozone depletion potential (ODP); global warming potential (GWP)
Healthcare project teams pursuing EQ credit Construction Indoor Air Quality
Management Plan should implement a(n) ___________________ that is based on both
SMACNA guidelines and the 2010 FGI Guidelines
Give this one a try later!
environmental quality management plan (EQMP)
MR credit PBT Source Reduction: Mercury prohibits the use of _______________ due to the
high rate of breakage and risk of mercury exposure for staff and patients
Give this one a try later!
circular fluorescent lamps
The RP category contains a single credit that can earn a project up to _____ points for
meeting any ______ of the _____ credits specific to the project's locale.
Give this one a try later!
4; 4; 6
the ____________ was established to help project teams with multiple rating system
choices decide on a rating system and is based on the percentage of a project's gross
, floor area that is appropriate for a particular rating system
Give this one a try later!
40/60 rule
The intent of ___________________ is to encourage the team integration required by a LEED
project and to streamline the application and certification process.
Give this one a try later!
IN credit LEED Accredited Professional
To meet the requirements of MR prerequisite PBT Source Reduction:Mercury, project
teams must identify the following:
Give this one a try later!
- types of mercury containing products and devices to be collected
- how the mercury containing products and devices are to be handled by a
recycling program
- the disposal methods for captured mercury
The 5 categories for "diverse uses" includes the following:
Give this one a try later!
- food retail
- community-serving retail
- services