Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC California UST Inspector Real Exam Questions & Answers 2025

Rating
-
Sold
-
Pages
160
Grade
A+
Uploaded on
08-06-2026
Written in
2025/2026

Authentic exam preparation material for the ICC California UST (Underground Storage Tank) Inspector certification test, featuring real exam questions with verified correct answers for 2025. Covers all essential topics: UST system design and components, leak detection methods (automatic tank gauging, interstitial monitoring, statistical inventory reconciliation), corrosion protection (cathodic protection), spill and overfill prevention devices, secondary containment, monitoring and release detection, California specific regulations (SWRCB and local CUPA requirements), federal EPA standards (40 CFR 280), inspection checklists, recordkeeping, release reporting, site assessment, corrective action, tank closure, and enforcement. Designed for environmental health inspectors, tank compliance officers, and candidates preparing for the ICC UST Inspector exam in California.

Show more Read less
Institution
ICC California UST Inspector
Course
ICC California UST Inspector

Content preview

1



ICC CALIFORNIA UST INSPECTOR REAL
EXAM TEST QUESTIONS WITH CORRECT
ANSWERS 2025/2026 LATEST BEST
QUALITY GRADED EXAM

Which of the following would not require secondary containment testing?

a.) Interstitial space hydrostatically monitored

b.) Under-dispenser containment

c.) Turbine piping sump

d.) Secondary piping -- ANSWER--a.) Interstitial space hydrostatically monitored

CCR Title 23, Sec 2637(g)



Fiberglass tanks shall be repaired by the following, except:

a.) Small fractures and fissures may be repaired with epoxy

b.) Fiberglass cloth with a minimum dimension 12 x 12 inches centered over the area to be
repaired.

c.) A second layer of fiberglass cloth shall be installed directly over the primary cloth layer
and shall be cut to overlap the primary patch by 5 inches on all sides.

d.) The repaired tank shall be tested for tightness within 30 calendar days following the date
of the completion of the repair. -- ANSWER--c.) A second layer of fiberglass cloth shall be
installed directly over the primary cloth layer and shall be cut to overlap the primary patch by
5 inches on all sides.

CCR Title 23, Sec 2661(d)(4)

, 2


Automatic line leak detectors shall be installed on underground pressurized piping and shall
be capable of detecting a 3-gallon per hour leak rate at 10 psi within 1 hour with a probability
of detection of at least % and a probability of false alarm no greater than %.

a.) 95, 5

b.) 98, 2

c.) 5, 95

d.) 2, 98 -- ANSWER--a.) 95, 5

CCR Title 23, Sec 2636(f)(2) & 2643(c)(1)



An emergency impact valve (shear valve) is found in the following location on an UST
System.

a.) At the turbine piping termination

b.) Base of the dispenser

c.) Under the extractor tee

d.) Spill container -- ANSWER--b.) Base of the dispenser



Notification to perform a secondary containment test must be given to the local agency by:

a.) A service technician or a licensed tank tester.

b.) Cathodic protection tester.

c.) Owner/operator of UST.

d.) State Water Resources Control Board. -- ANSWER--c.) Owner/operator of UST

CCR Title 23, Sec 2637(f)



An owner or operator of an underground storage tank or any part thereof that is destined for a
specific reuse shall advise the local agency, within the time frame specified by that agency, of
all of the following, except:

, 3


a.) The nature of intended use

b.) The name of the new owner and new operator of the UST

c.) The location of intended use

d.) The State Water Resources Control Board must be advised not the local agency --
ANSWER--d.) The State Water Resources Control Board must be advised not the local
agency

CCR Title 23, Sec 2672(b)(4)



Any person(s) installing underground storage tank systems or components shall be certified
or licensed by:

a.) The Contractors State License Board

b.) The local agency

c.) The State Water Resources Control Board

d.) The Regional Water Quality Board -- ANSWER--a.) The Contractors State License Board

CCR Title 23, Sec 2715(g)



The designated UST operator(s) shall perform monthly visual inspections of all UST's for
which they are designated. The monthly visual inspection shall include all of the following,
except:

a.) Inspecting for the presence of hazardous substances, water, or debris in spill containers.

b.) By July 1, 2005, verify that all facility employees have been trained.

c.) Reviewing the alarm history report or log for the previous month.

d.) Inspecting for the presence of hazardous substances, water, or debris in containment
sumps regardless of documentation showing each alarm for the previous month has been
responded to appropriately. -- ANSWER--d.) Inspecting for the presence of hazardous
substances, water, or debris in containment sumps regardless of documentation showing each
alarm for the previous month has been responded to appropriately.

, 4


CCR Title 23, Sec 2715(c)



Which agency approves a site-specific variance which allows for an alternative method of
construction or monitoring:

a.) The Regional Water Quality Board

b.) The State Water Resources Control Board

c.) The Department of Toxic Substance Control

d.) The local agency -- ANSWER--a.) The Regional Water Quality Board

CCR Title 23, Sec 2681(a)



The regulations to enforce compliance of underground storage tank systems in the state are
found in?

a.) Code of Federal Regulations, 40 CFR Part 281

b.) California Code of Regulations, Title 23, Chapter 16

c.) Code of Federal Regulations, 40 CFR Part 280

d.) California Code of Regulations, Title 23, Chapter 17 -- ANSWER--b.) California Code of
Regulations; Title 23, Chapter 16



By definition an "underground storage tank system" includes

a.) The tank, all connected piping and dispensers

b.) The tank, all connected piping, ancillary equipment and containment system

c.) Only the tank

d.) Only tanks totally beneath the surface of the ground -- ANSWER--b.) The tank, all
connected piping, ancillary equipment and containment system

Written for

Institution
ICC California UST Inspector
Course
ICC California UST Inspector

Document information

Uploaded on
June 8, 2026
Number of pages
160
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$20.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
EliteDocs01

Get to know the seller

Seller avatar
EliteDocs01 Chamberlain School Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
11
Member since
3 year
Number of followers
0
Documents
1018
Last sold
2 days ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions