Revision
Which of the following is responsible for: developing the program and outlining the needs and
requirements of the end users as well as creating the overall budget of the project, including
land acquisition, development, design, and construction costs?
Building Code Regulators
General Contractor
Owners
Design professionals - correct answer ✔✔Owners
Within the various construction professionals, the construction manage is also often referred to
as the prime contractor.
True or False - correct answer ✔✔False
Lean Principles of construction are derived from manufacturing where wasted movement,
wasted time, wasted materials, and so on are removed from the process.
True of False - correct answer ✔✔True
The US Economy is often judged based on how the construction industry is performing.
True of False - correct answer ✔✔True
, The residential building sector consists of individual homes, apartments, condos, townhouses,
and prefabricated units. Typically residential construction uses steel products and is referred to
as light framing.
True or False - correct answer ✔✔False
Estimating the cost of the project is not considered a function of project management but that
of pre-construction technician.
True or False - correct answer ✔✔False
Which party is responsible for labor issues on the job?
Sub Contractor
Labor Union
Contractor
Owner - correct answer ✔✔Contractor
Design-Bid-Build allows for both sequential construction and for fast tracking depending on the
owner's requirements for project delivery.
True or False - correct answer ✔✔False
Which contract type features someone who serves as an advisor to the owner during design
and then is directly responsible for the quality, time, and cost of the construction? - correct
answer ✔✔CM at Risk