CTS-I Sample Q's + Notes | Questions and
Answers | Verified Solutions | 2026 Edition | Pass
Guaranteed
Save
Terms in this set (68)
What is the purpose of a "drawing To list out details of a group of similar items, like
schedule" in AV drawings? projectors or screens
To show how to install a particular The purpose of a drawing schedule is to list details
item in detail of similar items, such as projectors or screens, in a
To list out details of a group of single list instead of on every page of a drawing
similar items, like projectors or set.
screens
To keep track of when items need to
be installed
To account for all the accessories
necessary to install a particular item
Duty A, Task 1
,Which project document indicates Gantt chart
how long the project is planned to
take from start to finish? A Gantt chart displays every element of the project
from the start date to completion.
Gantt chart
Risk mitigation resiger
Work breakdown structure (WBS)
Stakeholder list
Duty A, Task 1
What describes this type of symbol? Elevation flag
Detail note flag
Call out flag
Elevation flag
Section cut indication
Duty A, Task 1
Which of the project documents Work breakdown structure (WBS)
contains the project’s tasks broken
down into functional pieces that help Work breakdown structure or WBS is the key
determine what will need to be document to breaking up a project into
done? manageable pieces.
Risk mitigation register
Work breakdown structure (WBS)
Stakeholder list
Gantt chart
Duty A, Task 1
,The drawing set indicates that When the wall framing is still exposed
blocking is necessary to mount a
monitor. When is the BEST time to When the wall framing is still exposed, blocking
ensure that it is installed? should be installed before the drywall/gypsum
board is installed. It will be easy to see at this point.
After the wall is installed but before
it is plastered
When the wall framing is still
exposed
When the room is finished and the
wall is painted
When pulling cable to the monitor
location
Duty A, Task 2
An installation had been scheduled a Call the client to confirm the space is open and
month earlier for a finished ready.
workspace. On the day before
leaving for the job site, what is the A site might have been previously scheduled for
MOST important item an AV installer the date, however, things can change. Calling
must perform? ahead confirms the appointment and avoids
showing up when the site is not ready.
Load the van with installation tools
and equipment.
Arrange for the loading dock and
parking location.
Call the client to confirm the space is
open and ready.
Review drawing sets and be ready to
redline them onsite.
Duty A, Task 3
, During a facility readiness site visit, it RFI (request for information)
is discovered that an electrical outlet
is not where it is supposed to be for An RFI (request for information) is used by all allied
the ceiling projector. Which trades to communicate official information
document should an AV installer use requests, and it is tracked throughout the project.
to communicate the concern?
CCD (construction change directive)
EIF (electrical issue form)
RFI (request for information)
COR (change order request)
An RFI (request for information) is
used by all allied trades to
communicate official information
requests, and it is tracked throughout
the project.
Duty A, Task 3
Answers | Verified Solutions | 2026 Edition | Pass
Guaranteed
Save
Terms in this set (68)
What is the purpose of a "drawing To list out details of a group of similar items, like
schedule" in AV drawings? projectors or screens
To show how to install a particular The purpose of a drawing schedule is to list details
item in detail of similar items, such as projectors or screens, in a
To list out details of a group of single list instead of on every page of a drawing
similar items, like projectors or set.
screens
To keep track of when items need to
be installed
To account for all the accessories
necessary to install a particular item
Duty A, Task 1
,Which project document indicates Gantt chart
how long the project is planned to
take from start to finish? A Gantt chart displays every element of the project
from the start date to completion.
Gantt chart
Risk mitigation resiger
Work breakdown structure (WBS)
Stakeholder list
Duty A, Task 1
What describes this type of symbol? Elevation flag
Detail note flag
Call out flag
Elevation flag
Section cut indication
Duty A, Task 1
Which of the project documents Work breakdown structure (WBS)
contains the project’s tasks broken
down into functional pieces that help Work breakdown structure or WBS is the key
determine what will need to be document to breaking up a project into
done? manageable pieces.
Risk mitigation register
Work breakdown structure (WBS)
Stakeholder list
Gantt chart
Duty A, Task 1
,The drawing set indicates that When the wall framing is still exposed
blocking is necessary to mount a
monitor. When is the BEST time to When the wall framing is still exposed, blocking
ensure that it is installed? should be installed before the drywall/gypsum
board is installed. It will be easy to see at this point.
After the wall is installed but before
it is plastered
When the wall framing is still
exposed
When the room is finished and the
wall is painted
When pulling cable to the monitor
location
Duty A, Task 2
An installation had been scheduled a Call the client to confirm the space is open and
month earlier for a finished ready.
workspace. On the day before
leaving for the job site, what is the A site might have been previously scheduled for
MOST important item an AV installer the date, however, things can change. Calling
must perform? ahead confirms the appointment and avoids
showing up when the site is not ready.
Load the van with installation tools
and equipment.
Arrange for the loading dock and
parking location.
Call the client to confirm the space is
open and ready.
Review drawing sets and be ready to
redline them onsite.
Duty A, Task 3
, During a facility readiness site visit, it RFI (request for information)
is discovered that an electrical outlet
is not where it is supposed to be for An RFI (request for information) is used by all allied
the ceiling projector. Which trades to communicate official information
document should an AV installer use requests, and it is tracked throughout the project.
to communicate the concern?
CCD (construction change directive)
EIF (electrical issue form)
RFI (request for information)
COR (change order request)
An RFI (request for information) is
used by all allied trades to
communicate official information
requests, and it is tracked throughout
the project.
Duty A, Task 3