✔✔1910.134 - ✔✔You are the Safety Director for MMM company. You are requiring the
use of respirators. What standard do you use for guidelines?
✔✔PFD, Life Jacket & SKIF - ✔✔What are the requirements when working near and
over water?
✔✔100ft - ✔✔What is the maximum travel distance to get a fire extinguisher?
✔✔Subpart F (Fire) - ✔✔Define flammable and combustible materials. Locate:
✔✔Bonding - ✔✔What must be done when transferring flammable liquids from one
container to another to prevent sparking hazards?
✔✔So that they are visible - ✔✔How/where must accident prevention signs be placed to
warn employees of a hazard?
✔✔Sub G signs, MUTCD - ✔✔What regulation must be followed by flaggers?
✔✔1926.250 A2 - ✔✔What are the requirements when storing on a floor other than slab
or grade?
, ✔✔1926.251 A1 - Every shift, before use and as needed - ✔✔When should rigging
equipment be inspected?
✔✔1926.300 B4 where work is performed. - ✔✔What is the definition of point of
operation?
✔✔Ring test - ✔✔What is required before mounting an abrasive wheel?
✔✔Maintain hand and power tools in a safe condition - ✔✔What does 1926.300 (a)
require?
✔✔Yes - ✔✔Can the employer be cited for my defective hand tools?
✔✔20' or Barrier 5' High and 1/2 fire - ✔✔What are the requirements for separation of
oxygen from fuel gas to combustibles?
✔✔Fire/Explosion - ✔✔If oil or grease is on regulator or valve of oxygen, what could
happen when attached?
✔✔Erect a Barrier/Shield - ✔✔What is a welder required to do when other employees
are working in the area?
✔✔When not part of the permanent wiring of a building. - ✔✔When is a GFCI or an
assured equipment grounding conductor program required?
✔✔50 volts or more shall be guarded. - ✔✔What is the maximum voltage of live parts of
electric equipment above which they must be guarded against accidental contact?
✔✔Prevent shock - ✔✔What is the purpose of the equipment grounding conductor in a
portable tool?
✔✔Competent Person - ✔✔Who must be on site when scaffolds are erected, moved,
dismantled, or altered?
✔✔20-30" - ✔✔When can the cross bracing on a scaffold be used as a midrail?
✔✔10' - ✔✔At what height is fall protection required on a built-up scaffold (Fabricated
frame scaffold)
✔✔Free fall more than 6ft nor come in contact the lower level. - ✔✔When rigging a
personal fall arrest system and to stop a fall, an employee cannot:
✔✔10ft Mechanical Equipment - ✔✔What is the required distance for a warning line to
be placed from the roof edge when mechanical equipment is being used?