◉ CQC
Answer: contractor quality control
◉ Superpave
Answer: Asphalt mix design system since 1998
◉ QCP
Answer: Quality control plan
◉ QCM
Answer: Quality control Manual
◉ QC
Answer: Quality Control (Contracting Testing and Inspection)
◉ VT
Answer: Verification Testing (FDOT or CEI Verification)
,◉ CEI
Answer: Construction Engineering and Inspection
◉ RT
Answer: Resolution Testing (FDOT)
◉ IV
Answer: Independent Verification Testing
◉ IA
Answer: Independent Assurance Testing
◉ The decision-making authority on a job needs to be given to who?
Answer: Needs to be given to the level closet to the work as specified
in the specifications. It ensure a quick handle on situations and
issues.
◉ The governing order of project documents from high (1) to low
(7) starts with the highest being
Answer: Special Provisions
, ◉ The governing order of project documents from high to low (2)
Answer: Technical Special Provisions
◉ The governing order of project documents from high to low (3)
Answer: Plans
◉ The governing order of project documents from high to low (4)
Answer: Road design, structures, and traffic operations standards
◉ The governing order of project documents from high to low (5)
Answer: Developmental Specifications
◉ The governing order of project documents from high to low (6)
Answer: Supplemental Specifications
◉ The governing order of project documents from high to low (7)
Answer: Standard Specifications
◉ What are the key components in a pre-paving conferences?
Answer: Key Personnel (Paving superintendent)
Contractor Input
Agency Input