●● Feedback loop
Answer: What is the order in which feedback is presented on an aspect
of a project?
●● Creep
Answer: Continuous and unauthorized growth of a project scope is
known as scope______
●● Demographics
Answer: Age, culture, education levels, income levels, and access needs
for vision or hearing impairments are all examples of?
●● Wide
Answer: The audience for a web banner would be?
●● Vibrant, eye-catching, readable, and appeal to a wide variety of ages
and cultures
Answer: With a web banner file, the audience will need the project to
be?
,●● Color schemes
Answer: Projects used for print and web have different?
●● Runners and sponsors
Answer: Who would be the target audience for a 5K run T-shirt?
●● Wireframe
Answer: A web project visual guide that will represent The overall look
of the website.
●● Prototype
Answer: Previously a wireframe, but does not contain live content but is
very close to the finished product
●● Iteration
Answer: A cycle of a design plan. The first cycle can be a sketch. Next
could be a wireframe if it is a web project.
●● Project scope
Answer: The project details of how, why, and when that define the
project.
, ●● Change orders
Answer: Needed when there is a change to the project scope. They need
to be requested and receive an approval or denial.
●● Feedback loop
Answer: The order that feedback is given on specific parts of a project.
●● Scope creep
Answer: Unauthorized changes to a project scope that can destroy a
project.
●● Timeline
Answer: The estimated time it will take to complete a project.
●● Breadth and depth
Answer: Knowledge of a subject and areas to focus on in that subject.
●● Task
Answer: Individual parts of the project that need to be completed.
●● Resources
Answer: Materials, staff, or other items that will add value to the project.